Laserfiche WebLink
ate.,..:•. <br /> SEPTIC TANK AND PUMP CHAMBER CROSS SECTION AND SPECIFICATIONS <br /> Locking cover with Weather Proof Junction Box. <br /> warning label.Access Electrical as per NEC 300 and <br /> Vent Pipe opening, not lop must exlDnd at least 4'cover, Comm 16.28 WAC <br /> > 12'above grade above finished grade. <br /> Access opening,not top <br /> of cover,must extend to Maximum Cover over Tank_ <br /> a point no greater than 6' <br /> below finished grade. <br /> Disconnect 23'Min. Opening <br /> 18"min. E r— Alternate <br /> outlet <br /> location <br /> 23'Min. Force Main Diameter <br /> ;Opening Approved <br /> Building effluent filter rce Main Length <br /> sewer <to 1/8' A <br /> particle size <br /> Weep hole or anti <br /> siphon device. <br /> 8 <br /> C <br /> D Pump Off Elev. <br /> Dose Tank Elev. 7.2 <br /> Bed and backfill lank according to manufacturers specifications <br /> Anchor tank as necessary to negate buoyant forces. Note: All pipe and vent materials comply with Coram 84. <br /> Tank Manufacturer: ' eep It Doses Per Day: /�- t <br /> Tank Sizes: Septic /P si� Gallons GPD/# of Doses: 19,6 gallons <br /> Pump,LZZLGallons Backflow: 6 D gallons <br /> Gallons Per Inch:/6/r14/ Total Dose Volume: _gallons <br /> it <br /> Liquid Level: 5' Required GPM: — <br /> Pump Manufacturer: , �1 Psf Dimensions Inches Gallons <br /> s3 <br /> Pump Model: SA a� B O-Z- 34 <br /> Alarm Manufacturer: 7- 7'oRaL C s2 <br /> D <br /> Alarm Model: ����.P ���` Total <br /> Vertical Difference between pump off and distribution pipe - _ <br /> Minimum Required Supply Pressure (0 for dosed conventional) _ <br /> /�L Feet of force main x friction factor/ 100 = S 3 <br /> Total Dynamic Head = <br />