Laserfiche WebLink
sen 667819B111Ple tonal 11 1 ' <br /> Detach And Return U STATE OF WISCONSIN D <br /> Upper � DIVISION OF SAFETY& BUILDINGS <br /> portion Of This farm With BUREAU OF PLUMBING <br /> 201 E.WASHINGTON AVE. RM 178 <br /> Any Return Correspondence P.O. BOX 7969 <br /> MADISON,W 153707 <br /> 608266-3815 <br /> DATE: 05/24/84 <br /> PROJECT: <br /> Anderson, Larry - Residence <br /> 2 ( ) <br /> NE,NE,19;37,18W <br /> Tn Trade Lake <br /> Byron Bird, Jr. Burnett WI <br /> Route 2 <br /> Grantsburg, WI 54840 <br /> P LAN ID. # 84-02818 <br /> DETACH HERE <br /> PROJECT NAME Anderson, Larry - Residence PLANID. # 84-02818 <br /> This is to acknowledge receipt of your plans and specifications for the above-indicated project. <br /> Preliminary review indicates the requited fee is$�n. Fee Received is S .30'00 <br /> ❑ Underpayment —Please submit the additional fee. ❑ Overpayment — Refund forthcoming. <br /> ❑x Plan accepted for review. ❑ Plans being returned. <br /> ❑ No fee has been remitted. Plans submitted with no fees will be ❑ Additional information required.SEE BELOW. <br /> held in abeyance. <br /> I. Plan Submission ❑ Complete data relative to anticipated use of bldg. <br /> ❑ Additional information shall be submitted in duplicate on ❑2 copies of PLB 60 enclosed. <br /> less specifically noted. ❑ Deed restriction required II copy). <br /> ❑ Plans not clear, legible or permanent. ❑ Condominium declaration. 0 copy) <br /> ❑ All information submitted shall ba signed,dated and scaled <br /> or stamped in accord with Section H 63.08(2)(a)Wisconsin <br /> Administrative Code. ❑Affidavit enclosed. IV. Holding Tanks <br /> ❑ Profile of holding tank showing vent, manhole alarm and <br /> r manufacturer if precast. Complete construction details if <br /> II. Pressurize Distribution Systems(Mound or In Ground Pressure) site constructed. <br /> ❑ Application for use of an alternative system signed by owner ❑ Holding tank agreement signed by owner and local unit of <br /> and notarized. (1 copy) government (ample enclosed). <br /> ❑ County onsite required (1 copy). ❑ Design calculations ❑ Reason for installing holding tank.Soil test or statement <br /> for pressurize distribution. ❑Soil boring & percolation <br /> from county (1 copy). <br /> test data. ❑ Plot plan showing location of holding tank with lateral dist <br /> ❑ Cross section of system. Cl Pipe lateral layout. ances to any building, wells, water service piping, water <br /> ❑ Plan view of system. ❑Plot plan, course, lot lines, swimming pools, all weather service road, <br /> ❑ Verification of Exception Status Form by County. (1 copy) Etc.Provide benchmark with elevation reference point. <br /> III. Private Sewage Disposal Systems V. Litt Pump <br /> ElGround slope with 2' contours in entire area of soil absorp- ❑ Calculations for total lift pump discharge, head and gallons <br /> tion system extending 25'on all sides. pumped per cycle. - <br /> ❑ Elevation of permanent reference Point (benchmark). El Size, length&depth of force main. <br /> ❑ Locetion of area suitable for replacement system - provide ❑ Detail & model of pump or automatic siphons including <br /> soil data, size,pump curves,drawdown and average flow rate GPM. <br /> ❑ Plot plan showing lot size and all lateral distances from ❑ Cross section of lift pump tank showing pump()or <br /> sewage disposal system to buildings, lot lines, well, water <br /> siphon(s). <br /> course,swimming pools,water service piping, Etc. <br /> ❑ Construction detail of septic, holding or lift pump tank if ' <br /> site constructed or tank manufacturer if precast. VI. Systems In Fill (Fill must be placed prior to plan submission)- <br /> ❑ Construction detail and cross-section of soil absorption ❑ Total area filled (fill to extend 20' beyond edge of trench <br /> system. before side slope begin). <br /> ❑ Soil boring and percolation test on 115 completed by cer- ❑ Depth and type of fill. <br /> tified soil tester (1 Copy). ❑ Copy of onsite report by county or district staff. <br />