Laserfiche WebLink
Surveyor checks these after GIS review <br /> ✓ Math check each lot and add all parts to be sure totals are correct. <br /> L/ Does the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Al/'Does the CSM cross a section line, 40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> x Reconciles with Real Property Listing—Comments -(ax tp ,ojo <br /> x Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> - Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> - Has the CSM been approved by all approving authorities like a plat? <br /> - Is it monumented the same as a plat with bigger monuments at corners? <br /> td„ Has there been an adjacent CSM recorded with 4 parcels of 1 %2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> 45 Is the parcel in MFL? <br /> NI. Does CSM change or cross school or other taxing districts? <br /> x Parcel Identification Number(s): O7-CM-a-38-lb-a3-3 p3-e1)-attOc <br /> x Lot Number with improvements—Comments Lxit- ' camel-otos tmpccoe -s <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes ow �(,i(iS (;�/r,L cU VyJ /( " <br /> ,y) I <br /> SIGNATURE OF REVIEWER: /,0.6_ DATE: ‘//7-9 ?// <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />