Laserfiche WebLink
Hope this helps. <br /> Jacob Druffner <br /> Phone: (715)461-0159 <br /> jacob.druffner@wisconsin.gov <br /> We are committed to service excellence. <br /> Visit our survey at http://dnr.wi.gov/customersurvey to evaluate how I did. <br /> From: Craig Selander<craig@selander-architect.com> <br /> Sent:Sunday, February 21, 2021 7:56 PM <br /> To: Druffner,Jacob D- DNR<jacob.druffner@wisconsin.gov> <br /> Subject: Floodplain Questions on a Project on Yellow Lake <br /> Jacob — <br /> I am an Architect developing a design for a new cabin on Yellow Lake in the edge of a floodplain. The address <br /> of the property is 8036 Premo Road, Webster, WI. The current plan is to remove the existing cabin. A LOMA <br /> was completed in 2020 for the previous Owner and it was determined the existing cabin is out of the <br /> floodplain. I have attached an aerial of the property from the county website and a Site Plan Concept. <br /> I have received a comprehensive Map of Survey of the site from Wagner Surveying as we needed to know <br /> where the floodplain is located so we can properly address. I have been working with the Wagner Surveying <br /> and Jason Towne to address the floodplain concerns. In December, Jason Towne indicated the next step was <br /> to submit a CLOMAF-R and obtain approval from FEMA to build where planned; this would require adding <br /> limited fill. At that time, he saw no other concerns. <br /> Last week, I received a copy of the letter you sent to Jason Towne regarding Floodplain Zoning for Zone A and <br /> AE with No Floodway Delineated. According to Jason, you letter outlining the requirements to build at the <br /> edge of a floodplain changes how Burnett County has treated floodplains for decades. From Jason, I <br /> understand the Owner we will now need to hire an engineer to certify that the fill will not increase the flood <br /> risk. <br /> Your letter states "Any development including fill cannot be placed in the floodplain without a floodway <br /> delineation to determine whether the use is permitted and what impacts are on the regional flood <br /> elevation." Can your review the attached information on this project and answer the following questions for <br /> me. <br /> 1. Specifically what does an engineer need to complete for this new cabin to be built where planned? <br /> 2. Do you have any suggestions for an engineer I can contact to discuss and determine how to approach? <br /> Drop me an email to my questions once you have reviewed. I appreciate your input and assistance. <br /> If you have questions of me, my cell number is best. <br /> Thanks, <br /> Craig S aaA . e r <br /> craiqselander-architect.com <br /> Craig Selander, Architect, LLC <br /> 2 <br />