Laserfiche WebLink
Plan Viefe and System Cross Section Pae 3 o <br /> v g f 5 <br /> Kevin & Laura Fossum <br /> allons Per Day 450 ivided by Load Rate 1.00 = 450 Sq. Ft. Cell <br /> Synthetic Covering <br /> ASTM C3.3 Distribution Pipe <br /> Medium Sol d <br /> 611 Topsoil " <br /> 3 E D <br /> IV I <br /> Slope 15$ Bed Of 1- 2 j Force Main Plowed <br /> Aggregate Layer <br /> (6" below Pips) <br /> Slope 15% <br /> C'065 Section Of A Mound System Using Mound Height E = 2 .95 Ft. <br /> A Bed For The Absorption Area F = .80 Ft. <br /> G = 0.50 Ft. <br /> H = 1.00 Ft. <br /> /— <br /> Access Box Cell Width A = 8.0 Ft. <br /> Cell Length B = 57 Ft. <br /> Threaded Plug Mound Length K = 12 .45 Ft. <br /> Lateral Manifold L = 81.90 Ft. <br /> Mound Width J = 7 Ft. <br /> 2 = 24 Ft. <br /> orlfie, W = 39 Ft. <br /> Observation pipes 9.50 ft. from each end of cell. <br /> �y � Observation Pipe <br /> I-- -- ------=------- <br /> r--------- ------------------------------ <br /> A o o ! - <br /> �-- -- <br /> W ---- ---------- ------ 1 Force Moln <br /> — — --- exas <br /> -----J <br /> Dist ibulion Bed Of '%I�— 2 <br /> la• <br /> 1 Aggregate <br /> Observa ion Pipe <br /> Pion View Of Mound Using A Bed For The Absorption Area <br />