Laserfiche WebLink
RICK BROWN Page 2 3/10/2010 <br /> • Materials shall conform to the requirements of COMM 84. <br /> • Maintain well and waterline set backs per COMM 83.43(8)(i).Consult the Department of Natural Resources for <br /> well setbacks and other regulations and exceptions. <br /> A copy of the approved plans, specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. <br /> In granting this approval the Division of Safety&Buildings reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance.As per state stats 101.12(2),nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building,structure,or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the address <br /> on this letterhead. <br /> The above left addressee shall provide a copy of this letter and the POWTS management plan to the owner and any <br /> others who are responsible for the installation,operation or maintenance of the POWTS. <br /> Sincerely, Fee Required$ 250.00 <br /> Fee Received$ 250.00 <br /> / Balance Due $ 0.00 <br /> Patricia S orf <br /> POWT'2: an Reviewer tegrated Services WiSMART code: 7633 <br /> (715)634-7810, Fax:(�5)*634-5150,M-th 8:00-4:45 <br /> r <br /> pat.sbandorf@wisconsin.gov <br /> cc: Carl J Lippert,Wastewater Specialist, (715)634-3484 <br /> Notice: Starting July 1,2009, no person or entity may engage or offer to engage in construction business in <br /> Wisconsin unless they hold a Building Contractor Registration,or equivalent,issued by the Safety and Buildings <br /> Division of the Wisconsin Department of Commerce. <br /> "Construction business"means a trade that installs, alters or repairs any building element, component, <br /> material or device that is regulated under the commercial building code, chs. Comm 60 to 66, the uniform <br /> dwelling code, chs. Comm 10 to 15, the electrical code, ch. Comm 16, the plumbing code, chs. Comm 81 to <br /> 87, or the public swimming pools and water attractions code, ch. Comm 90. The term does not include the <br /> delivery of building supplies or materials, or the manufacture of a building product not on the building <br /> site. <br /> For further information,go to our website:www.commerce.,Ai.gov/SB/SB-BuildingContractorProeram.hnnl <br /> Note: Effective March 29,2010,we are consolidating our Shawano full-service office with our Green Bay office. <br /> Please address all plans, correspondence,mail,etc.related to previous Shawano services,for delivery after that date, <br /> to:Division of Safety&Buildings,2331 San Luis Place, Suite 150,Green Bay,WI 54304. If calling moved <br /> Shawano staff after that date,call(715)492-5601. <br />