My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/08/25 - OTHER - (NA) - Note
Burnett-County
>
Property Files
>
TOWN OF LINCOLN
>
32012
>
2016/08/25 - OTHER - (NA) - Note
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 12:13:44 AM
Creation date
9/29/2017 9:20:34 AM
Metadata
Fields
Template:
Property Files v2
Document Date
8/25/2016
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Note
Tax ID
32012
Pin Number
07-016-2-39-17-29-4 04-000-011100
Municipality
TOWN OF LINCOLN
Owner Name
TIMOTHY BOWERS WILFRID C HINES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WDNR-GP4-2013 Permit Conditions-Recreational Development <br /> You agree to comply with the following conditions: <br /> 1. Application. You shall submit a complete application package to the Department as outlined in the <br /> application materials and section 2 of this permit. If requested, you shall furnish the Department,within a <br /> reasonable timeframe, any information the department needs to verify compliance with the terms and <br /> conditions of this permit. <br /> 2. Certification.Acceptance of general permit WDNR-GP4-2013 and efforts to begin work on the activities <br /> authorized by this general permit signifies that you have certified the project meets all eligibility standards <br /> outlined in Section 1 of this permit and that you have read, understood and have agreed to follow all terms <br /> and conditions of this general permit. <br /> 3. Reliance on Applicant's Data.The determination by this office that a confirmation of authorization is not <br /> contrary to wetland water quality standards will be based upon the information provided by the applicant and <br /> any other information required by the DNR. <br /> 4. Project Plans. This permit does not authorize any work other than what is specifically described in the <br /> notification package and plans submitted to the Department and you certified is in compliance with the terms <br /> and conditions of WDNR-GP4-2013 <br /> 5, Expiration. This WDNR-GP4-2013 expires on July 19, 2018. The time limit for completing work authorized <br /> by the provisions of WDNR-GP4-2013 ends 5 years after the date on which the discharge is considered to <br /> be authorized under WDNR-GP4-2013 or until the discharge is completed,whichever occurs first. <br /> 6. Other Permit Requirements.You are responsible for obtaining any other permit or approval that may be <br /> required for your project by local zoning ordinances,floodplain ordinance,other local authority, other state <br /> permits and by the U.S.Army Corps of Engineers before starting your project. <br /> 7. Authorization Distribution. You must supply a copy of the permit coverage authorization to every <br /> contractor working on the project. <br /> 8. Project Start. You shall notify the Department before starting construction. <br /> 9. Permit Posting. You must post a copy of this permit coverage letter at a conspicuous location on the project <br /> site prior to the execution of the permitted activity, and remaining at least five days after stabilization of the <br /> area of permitted activity. You must also have a copy of the permit coverage letter and approved plan <br /> available at the project site at all times until the project is complete. <br /> 10. Permit Compliance. The department may modify or revoke coverage of this permit if it is not constructed in <br /> compliance with the terms and conditions of this permit, or if the Department determines the project will be <br /> detrimental to wetland water quality standards. Any act of noncompliance with this permit constitutes a <br /> permit violation and is grounds for enforcement action.Additionally,if any applicable conditions of this permit <br /> are found to be invalid or unenforceable,authorization for all activities to which that condition applies is denied. <br /> 11. Construction Timing. Construction should take place during frozen or dry conditions where practicable. <br /> 12. Construction. No other portion of the wetland may be disturbed beyond the area designated in the <br /> submitted plans. <br /> 13. Project Completion.Within one week of completion of the regulated activity, you shall submit to the <br /> Department a statement certifying the project is in compliance with all the terms and conditions of this <br /> permit, and photographs of the activities authorized by this permit. This statement must reference the <br /> Department-issued docket number, and be submitted to the Department staff member that authorized <br /> coverage <br /> 14. Proper Maintenance. You must maintain the activity authorized by WDNR-GP4-2013 in good condition and <br /> in conformance with the terms and conditions of this permit utilizing best management practices. Any <br /> structure or fill authorized shall be properly maintained to ensure no additional impacts to the remaining <br /> wetlands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.