Laserfiche WebLink
1 <br /> Cross-section of an In-ground Component Cell <br /> Slope % = s <br /> Finished Grade = 96.0 <br /> Observation Pine <br /> Natural Grade = '15. 7 <br /> Finished Grade = se•o <br /> Lateral Elev. Natural Grade = 9s y <br /> �= <br /> System Elev.= 9d.7 I Geotestile Fabnc <br /> Y <br /> Treame,-A and'bispersal Zane' <br /> tionpressurized perforated drain piping shall conform to one of the standards listed in Tabie 8-1.30-' <br /> Geotextile Fabric to meet Comm 84.30(6)(g), Wis Adm.Code Requirements <br /> Stone Aggregate to meet Comm 84.30(6)(1), Wis Adm. Code Requirement <br /> ?Minimum of 12" of aggregate to include 2" over the top of distribution pipe. i <br /> Minimum of 12" of cover over top distribution cell <br /> Two observation/vent pipes to be provided per cell I <br /> I <br /> I <br /> Tj scale <br /> I <br />