My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002/01/17 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF RUSK
>
15562
>
2002/01/17 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 5:48:15 AM
Creation date
9/29/2017 2:47:06 PM
Metadata
Fields
Template:
Property Files v2
Document Date
1/17/2002
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
15562
Pin Number
07-024-2-39-14-01-4 04-000-012000
Legacy Pin
024310102700
Municipality
TOWN OF RUSK
Owner Name
JOHN ZEHM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chamber SAS <br /> SYSTEM ELEVATION AND SIZING CALCULATIONS <br /> Below Grade Chamber Soil Absorption Systems <br /> Brent and Susan Melton Owner's Name 10/1/01 Review Date <br /> 0Y or N Highly Pretreated Effluent <br /> Eft Suitable Soil 9 <br /> in Chamber Height 2ft Maximum Bury Depth 3 <br /> Infiltrator High Capacity Sidewinder <br /> 600 gpd Estimated Daily Peak Flow <br /> 0.70 gpd/ft`In-situ Wastewater Infiltration Rate 500.00 ft`Chamber Area <br /> 1.20 igpd/ft2 Permitted Chamber Infiltration Rate 17.14 ft2 per Chamber <br /> 30 No. of Chambers <br /> 97.00 ft Proposed SAS Elevation <br /> Soil Surface Acceptable Finished Grade EL 4(ft) <br /> Boring Grade Limitation SAS Elevation(ft) System Minimum Maximum <br /> Number Elevation(ft) Depth(in) Lowest Highest Elevation? 99.38 103.38 <br /> 1 102.00 110 95.83 100.63 Yes <br /> 2 101.70 110 95.53 100.33 Yes <br /> 3 99.80 100 94.47 98.43 Yes <br /> 1. Depth of suitable soil required below the infiltrative surface for treatment. <br /> 2. Total height of chamber in inches. <br /> 3. Ma>amum bury depth as per manufacturer's recommendations. <br /> 4. Based on chosen system elevation,and chamber height. Top of chamber is <br /> equivalent to top of aggregate. The addition of fill for cover or the reduction of <br /> finished grade may be required to meet minimum or rr)dmum code standards. <br /> Version 2.0 (R.03/01) <br />
The URL can be used to link to this page
Your browser does not support the video tag.