Laserfiche WebLink
10541N RANCH ROAD <br /> HAYWARD WI 54843 <br /> lvisc- <br /> TDD r e.sta .wi.Ussonsin <br /> www.00rnmerce.state.wi.Us/sb <br /> ov <br /> www.wiscensin.gov <br /> Department of Commerce <br /> Jim Doyle,Governor <br /> Cory L.Nettles,Secretary <br /> November 10,2003 <br /> CUST ID No.225851 ATTN:POWTS Inspector <br /> RICHARD HOPKINS ZONING OFFICE <br /> HOPKINS SAND&GRAVEL BURNETT COUNTY SPIA <br /> 27760 HWY 35 7410 CTH K#102 <br /> WEBSTER WI 54893 SIREN WI 54872 <br /> CONDITIONAL APPROVAL Identification Numbers <br /> PLAN APPROVAL EXPIRES: 11/10/2005 Transaction ID No.935870 <br /> Site ID No.667549 <br /> SITE: <br /> Mark&Kirsten Harrison Please refer to both identification numbers, <br /> E Devils Lake en above,in all correspondence with the agency. <br /> Rd <br /> Town of Oakland <br /> Burnett County <br /> SW1/4,NWl/4,S35,T40N,R16W <br /> FOR:New mound,450 GPD <br /> Object Type:POWT System Regulated Object ID No.:928238 P 0. 1 <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes CQ iidtti( <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in <br /> chapter 101.01(10),Wisconsin Statutes,is responsible for compliance with all code requirements. �O <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: � PaS`Sp4 <br /> General Approval Conditions: <br /> ed and located in accordance with the enclosed approved <br /> lans <br /> nd <br /> th the <br /> • Mltem is to be Component Mtl for Septic Tank Effluent for Private Onsite Wastewater Systems"ms'a BDl 0691-P SE� <br /> "Mound Manual <br /> (N.01101)and the "Pressure Distribution Component Manual for Private Onsite Wastewater Treatment <br /> Systems" SBD-10706-P(N.01/01). <br /> • In the event this soil absorption system or any of its component parts malfunctions so as to create a health <br /> hazard,the property owner must follow the contingency plan as described in the approved plans.In addition, <br /> the owner must insure that the operation,maintenance and monitoring duties as described in section VIII of <br /> the mound component manual are complied with. A copy of this information must be given to the owner upon <br /> completion of the project. <br /> Reminder <br /> • The orientation of the mound system must be such that the longest dimension is oriented along the surface <br /> contour per COMM 83.44(6)(a)2. <br /> • Limit activities in the area 15'beyond the down slope edge of the mound per Mound Component Manual. <br /> • Surface water drainage shall be diverted away from the system area per Mound Component Manual. <br /> • Materials shall conform to the requirements of COMM 84. <br /> • Maintain well and waterline set backs per COMM 83.43(8)(1). Consult the Department of Natural Resources for <br /> well setbacks and exceptions to the setbacks. <br /> A copy of the approved plans, specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br />