Laserfiche WebLink
WADE A RUFSHOLM Page 2 5/132011 <br /> • The gravelless system components must be installed in accordance with the manufacturer's printed instructions, <br /> the plan approval,and COMM 83 system sizing criteria. If there is a conflict between the manufacturer's <br /> instructions and the plan approval,the plan approval and code requirements will take precedence. <br /> • Care must be taken to preserve the bench mark during construction. <br /> • The designer proposes to install an outlet filter to achieve the requirement of wastewater particle size. Access to <br /> the filter for cleaning must be provided per ss. Comm 84.25 (7)and(8),Wis.Adm. Code product approval <br /> conditions. Maintenance information must be given to the owner of the tank explaining that periodic cleaning of <br /> the filter is required.The outlet filter shall be installed per product approval stipulations. <br /> Reminder <br /> • Materials shall conform to the requirements of COMM 84. Comm 84.10.No fixture,appliance,appurtenance, <br /> material,device or product may be sold for use in a plumbing system or may be installed in a plumbing system, <br /> unless it is of a type conforming to the standards or specifications of chs. Comm 82 and 83 and this chapter and <br /> ch. 145, Stats. <br /> • Surface water drainage shall be diverted away from the system area. <br /> • The existing POWTS must be properly abandoned per s. Comm 83.33 Wis.Adm.Code. <br /> • Insulate building sewer per COMM 82.30(11)(c). <br /> A copy of the approved plans,specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. <br /> In granting this approval the Division of Safety&Buildings reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance.As per state stats 101.12(2),nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building,structure,or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address <br /> on this letterhead. <br /> The above left addressee shall provide a copy of this letter and the POWTS management plan to the owner and any <br /> others who are responsible for the installation,operation or maintenance of the POWTS. <br /> Sincerely, Fee Required$ 325.00 <br /> ��`� Fee Received$ 325.00 <br /> / Balance Due $ 0.00 <br /> Patricia andorf l— <br /> POWTS Plan Revie ,Integrated Services WiSMART code:7633 <br /> (715)634-7810, Fax: (715)634-5150,M-fr 8:00-4:45 <br /> pat.shandorf@wisconsin.gov <br /> cc: Carl J Lippert,Wastewater Specialist,(715)634-3484 <br /> Notice: Starting July 1,2009, no person or entity may engage or offer to engage in construction business in <br /> Wisconsin unless they hold a Building Contractor Registration,or equivalent, issued by the Safety and Buildings <br /> Division of the Wisconsin Department of Commerce. <br /> "Construction business"means a trade that installs, alters or repairs any building element, component, <br /> material or device that is regulated under the commercial building code, chs. Comm 60 to 66, the uniform <br /> dwelling code, chs. Comm 20 to 25, the electrical code, ch. Comm 16, the plumbing code, chs. Comm 81 to <br /> 87, or the public swimming pools and water attractions code, ch. Comm 90. The term does not include the <br /> delivery of building supplies or materials, or the manufacture of a building product not on the building <br /> site. <br /> For further information,go to our website:www.commerce.wi.Qov/SB/SB-BuildinizContractorProaram.html <br />