Laserfiche WebLink
Safety and Buildings <br /> 10541 N RANCH ROAD <br /> 18isconsin <br /> DD#:(6 D WI -87774843 <br /> TDD#:(608)264-8777 www.commerc .wis onsin.gov <br /> www.wisconsin.gov <br /> Department of Commerce <br /> Scott McCallum,Governor <br /> Philip Edw.Albert,Secretary <br /> December 18,2002 <br /> CUST ID No.225851 ATTN.-POWTS Inspector <br /> RICHARD HOPKINS ZONING OFFICE <br /> HOPKINS SAND&GRAVEL BURNETT COUNTY SPIA <br /> 27760 HWY 35 7410 CTH K#102 <br /> WEBSTER WI 54893 SIREN WI 54872 <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES: 12/18/2004 Identification Numbers <br /> Transaction ID No.817794 <br /> SITE: Site ID No.654121 <br /> Ellenor Hotchkiss Please refer to both identification numbers, <br /> 23758 Poquette Lake Rd above,in all correspondence with theagency. <br /> Town of Dewey, 54871 <br /> Burnett County S15,T38N,R14W <br /> FOR:Replacement mound,300 GPD <br /> Object Type:POWT System Regulated Object ID No.: 884721 <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner,as defined in <br /> chapter 101.01(10),Wisconsin Statutes,is responsible for compliance with all code requirements. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: P <br /> General Approval Conditions: Cn d <br /> • This system is to be constructed and located in accordance with the enclosed approved plans and with the <br /> "Mound Component Manual for Septic Tank Effluent for Private Onsite Wastewater Systems"SBD-10691-P APP <br /> (N.01101)and the Pressure Distribution Component Manual for Private Onsite Wastewater Treatment OVART A <br /> c <br /> DIV <br /> Systems" SBD-10706-P(N.01/01). <br /> • In the event this soil absorption system or any of its component parts malfunctions so as to create a health <br /> hazard,the property owner must follow the contingency plan as described in the approved plans.In addition, SEE CCF <br /> the owner must insure that the operation,maintenance and monitoring duties as described in section VIII of <br /> the mound component manual are complied with.A copy of this information must be given to the owner upon <br /> completion of the project. <br /> Reminder <br /> • The orientation of the mound system must be such that the longest dimension is oriented along the surface <br /> contour per COMM 83.44(6)(a)2. <br /> • Limit activities in the area 15'beyond the down slope edge of the mound per Mound Component Manual. <br /> • Surface water drainage shall be diverted away from the system area per Mound Component Manual. <br /> • Materials shall conform to the requirements of COMM 84. <br /> • Abandon failing system per COMM 83.33. <br /> A copy of the approved plans,specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. <br />