Laserfiche WebLink
Towne, Jason <br /> From: Daniel Panik <daniel.panik@gmail.com> <br /> Sent: Monday, November 2, 2020 12:27 PM <br /> To: Towne, Jason; Kornmann, Michael <br /> Cc: Paula Hischer <br /> Subject: Re: Hischer Lake Lot <br /> Attachments: Infiltration Tunnel.pdf; Storm Water Treatment Plan.pdf <br /> Jason and Mike, <br /> Attached is the proposed stormwater treatment plan layout using infiltration tunnels. I have also attached the <br /> details on the infiltration tunnel that we plan to use. Please let me know if you have any questions. I believe <br /> this is the last item we needed to finalize for the zoning permit. <br /> Thanks, <br /> Dan <br /> 906-630-7514 <br /> On Tue, Oct 6, 2020 at 11:08 AM Towne, Jason<itowne@burnettcounty.org>wrote: <br /> Hi Dan—see my responses below in yellow. Thanks-Jason <br /> From: Daniel Panik<daniel.panik@gmail.com> <br /> Sent: Monday, October 5, 2020 8:41 AM <br /> To:Towne,Jason<jtowne@burnettcounty.org> <br /> Cc: Kornmann, Michael <mkornmann@burnettcounty.org> <br /> Subject: Re: Hischer Lake Lot <br /> Jason, <br /> Back in April of 2019 you did a site survey of the Hischer lake lot and noted the distance from the existing <br /> cabin wall to the ordinary high water mark. The old cabin had approximately 12"+ overhangs. Our new cabin <br /> is drawn to have 24" overhangs. The plan is to put the new cabin wall in the exact same location as the old <br /> cabin. Will the larger overhang be a problem with the set back requirement? No problem with a 24" <br /> overhang. Also at the rear of the cabin the wall is planned to be 5 feet from the septic tank then there is a 24" <br /> overhang, will this pose a problem with setbacks? No problem with a 24" overhang. I was assuming the tank <br /> setback requirement was so that we didn't disturb soil near the tank with the cabin footings. <br /> Also what is the typical process for verifying and signing off the cabin location on the site? Have we issued a <br /> permit yet? If so then we should have approved the location. I am confident we will get it placed in the same <br /> location as the old cabin, but I don't want to get too far into the project before someone says we are good to <br /> go. I want to make sure there are no surprises. We are hoping to get the footings in by the end of October. <br /> 1 <br />