Laserfiche WebLink
Safety and Buildings <br /> 10541 N RANCH ROAD <br /> HAYWARD WI 54843 <br /> TDD#: 264-8777 <br /> isconsin www•commeroe.rce.state.wi.us <br /> Department of Commerce Tommy G.Thompson,Governor <br /> Brenda J.Blanchard,Secretary <br /> May 22,2000 <br /> CUST ID No.225851 ATTN:POWTS INSPECTOR <br /> ZONING OFFICE <br /> RICHARD HOPKINS BURNETT COUNTY SPIA <br /> 27760 HWY 35 7410 CTH K#102 <br /> WEBSTER WI 54893 SIREN WI 54872 <br /> RE: CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES: 05/22/2002 Identification Numbers <br /> Transaction ID No.315696 <br /> Site ID No. 191977 <br /> SITE: Please refer to both identification numbers, <br /> Site ID: 191977, BEV BENSON above,in all correspondence with the agency. <br /> BURNETT County,Town of UNION;ANDERSON DR <br /> S23,T40N,R17W <br /> FOR: MOUND,300 GPD <br /> Object Type:POWT System Regulated Object ID No.:663223 P•�'W� <br /> ConditiO <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes AI?PRC <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner,as defined in 0 TMENT of <br /> chapter 101.01(10),Wisconsin Statutes,is responsible for compliance with all code requirements. ONEM <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: �� <br /> 1. This plan action is subject to designer comments on the plan. 11 SEE CORRE9 <br /> 2. The orientation of the mound system must be such that the mound's longest dimension is perpeAicular <br /> to the direction of maximum slope. <br /> 3. Vehicular traffic is prohibited in the area 25' beyond the down slope edge of the mound. <br /> 4. Maintain well and waterline set backs per COMM 83.10(1)and 83.14(4)(a). <br /> CAUTION:Wis.stats 145.135(2)(b) indicates that the approval of a sanitary permit is based on <br /> regulations in force on the date of approval. <br /> The effective date of COMM 83 revisions is expected to be July 1, 2000. <br /> Thus depending on the type of system and your design,this plan approval may not be <br /> eligible for sanitary permit approval if submitted to the issuing agency on or after July 1, <br /> 2000. <br /> Note: There is a potential for a law suit that may delay the effective date of the code so this status <br /> may or may not change. <br /> A copy of the approved plans,specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. All permits <br /> required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. <br />