Laserfiche WebLink
❑ Mound,At-Grade,In-Ground Pressure <br /> The inspection shall include recording the levels of ponding,if any in the observation tubes and a visual inspection for any <br /> evidence of surface seepage or discharge.Any discharge to the ground surface must be promptly reported to the regulatory <br /> authority. Ponding greater than 75%of the height of the component may indiCate Overloading or impending hydraulic failure <br /> necessitating more frequent monitoring. <br /> The pressure distribution system is provided with an opening at the end of each lateral to be used for flushing.The laterals <br /> should be flushed at least once every three(3)years,Pressure checks of systems with multiple laterals should be done to <br /> ensure that equal distribution of effluent is occurring to promote the longevity of the system. <br /> REPORTS <br /> Reports for maintenance, inspection,and monitoring shall be submitted in accordance with COMM 83.55 Wisconsin Administrative <br /> Code. <br /> ABANDONMENT <br /> When the POWTS fails and/or is permanently taken out of service the following steps shall be taken to ensure that the system is <br /> properly and safely abandoned in compliance with Ch. COMM 83.33, Wisconsin Administrative Code. <br /> All piping to tanks and pits shall be disconnected and the abandoned pipe openings sealed. <br /> The contents of all tanks and pits shall be removed and properly disposed of by a Septage Servicing Operator. <br /> - After pumping,all tanks and pits shall be excavated and removed or their covers removed and the void space filled with <br /> soil,gravel or other inert solid material. <br /> CONTINGENCY PLAN <br /> If the POWTS fails and cannot be repaired the following measures have been,or must be taken,to provide a code compliant <br /> replacement system: <br /> �( A suitable replacement area has been evaluated and may be utilized for the location of a replacement soil absorption system. <br /> The replacement area should be protected from disturbance and compaction and should not be infringed upon by required <br /> setbacks from existing and proposed structure,lot lines and wells.Failure to protect the replacement area will result in the <br /> need for a new soil from existing and proposed structure,lot lines and wells.Failure to protect the replacement area will <br /> result in the need for a new soil and site evaluation to establish a suitable replacement area. Replacement systems must <br /> comply with the rules in effect at that time. <br /> ❑ A suitable replacement area is not available due to setback and/or soil limitations. Barring advances in POWTS technology a <br /> holding tank may be installed as a last resort to replace the failed POWTs. <br /> ❑ The site has not been evaluated to identify a suitable replacement area Upon failure of the POWTS a soil and site evaluation <br /> must be performed to locate a suitable replacement area.If no replacement area is available a holding tank may be installed <br /> as a last resort to replace the failed POWTS <br /> ❑ Mound and at-grade soil absorption systems may be reconstructed in place following removal of the biomat at the infiltrative <br /> surface. Reconstructions of such systems must comply with the rules in effect at that time. <br /> :<WARNING>> <br /> EPTIC,PUMP AND OTHER TREATMENT TANKS <br /> ►XYGEN.DO NOT ENTER A SEPTIC, MAY CONTIAD/OR INS <br /> N LETHAL GASSES ANUFFICIENT <br /> DEPUMP OR OTHER TREATMENT TANK UNDER ANY CII2CUUFFI IE <br /> T <br /> ATH MAY RESULT.RESCUE OF A PERSON FROM THE INTERIOR OF A TANK MAY BE DIFFICULT NC <br /> VIPOSSIBLE. OR <br /> DDITIONAL COMMENTS <br /> ime INSTALLER POWTS MAINTAINER <br /> rine O�j{REI-�-HU EI L MFRS dt 22 107 S Name <br /> one (7 i5)X73-t�3 b0 Phone <br /> ,PTAGE SERVICING OPERATOR(Pumper) LOCAL REGULATORY AUTHORITY <br /> tine S-mj `s 56p-rr. Agency URAI pu ORITA16 <br /> one (71S) 8bb-'I X95 <br /> Phone 71 S 34q-ZI38 <br /> WPDATMEMPOWTS OWNER'S MANUAL.doc <br /> Page_of <br />