Laserfiche WebLink
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .t t trtrt3trrJ+1 t t t+�t;tr+�tr rrb t tT . . .r. �.. <br /> :00000p000p00000paaauop0000p.uo,oc0000uoo ouopaoo <br /> >n O 0 0 0 0 n J O O G 0 n 0 0 0 O O O O O O O <br /> opo n n,i 0 0 0 0 0 p O p p 0 0 <br /> t�`O O U O U O n p a O D U QO O O,O O h O(i O.O O O C_:O 6 0 0 0 J O L)O O O O O <br /> ivaoo"ooL;°o`aoouoa(,aa n.�=�1(-...�.�-.�a�n�>�� on000000°o <br /> ' o;�o_aaoo°o,o°oaooc,�u000.000 �;uoap.00000 . <br /> °..w0000°o°000c3��o°000°o°���000>00000a°voo°000 o°c000000 up°o°p°o°o <br /> o°o°o°a°o°°°o°o°o v°o°o ova°vo°q��oo°0000°oop �� o°o° <br /> - -- -- L <br /> 1 1 ft A 3.25 ft Basal Area Required 187.5 Ift2 <br /> K 1 ft B 46.5 ft Basal Area Proposed 244.125 ft2 <br /> S 0.00 ft L 48.5 ft <br /> W 5.25 ft <br /> Basal Area Calculation GeoMat Dis ersal Cell Basal Area Calculation <br /> GPD Loading Rate GPD Loading Rate <br /> 300 1.6 gal/sq May 300 2.00 gal/sq May <br /> Totall 187.5 ft2 Total 150 ft2 <br /> Pro osed 151.125 ft2 <br /> Number of Cells 1 GeoMat Width 3.25 ft <br /> Cell Length 46.50 ft Lineal Feet of GeoMat Required 46.2 <br /> Min. Cell Len th 46.2 ft Lineal Feet of GeoMat Proposed 46.5 <br /> Cell Spacing 0.00 ft NOTE:Min S dimension= V <br /> System Elevation 96.5 ft <br /> Limiting Factor 94.35 ft <br /> Separation 2.15 ft 2'Min <br /> Directions: <br /> Play with cell length to get desired cell spacing, length and width. Remember system SHOULD be longer than it is <br /> wide. It must also Satisfy basal loading rate and GeoMat cell loading rate. <br /> Project: JEFF&LYNN PRIESS Page 3 of 13 <br />