Laserfiche WebLink
SERVICES <br /> `a DIVISION OF IND0541RN RANCH RD <br /> 'Y I HAYWARD WI 54843.6462 <br /> R Contact Through Relay <br /> http:/Idsps.wi.gov/programsfindustryserices <br /> www.wisconsin.gov <br /> J � ssionA4'� Tony Evers-Governor <br /> Dawn Crlm-Secretary <br /> April 8,2021 <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES: 2023-04-08 <br /> Plan Review: PWTS-012100481-C CONDITIONALLY <br /> APPROVED <br /> DEPT OF SAFETY AND PROFESSIONAL SERVICES <br /> RICHARD HOPKINS DIVISION OF INDUSTRY SERVICES <br /> 27760 State Road 35 <br /> Webster WI 54893 /I <br /> (� Z,eC�Ck-: <br /> SEE COMIESPONDENCE <br /> SITE: <br /> Dean Peterson <br /> 27430 W Conners Lake Road <br /> Burnett County <br /> Town of Oakland <br /> Gov't Lot 4—S35—T40N—R16W <br /> FOR: <br /> Description: Mound Component Manual—Ver. 2.0,SBD- <br /> 3 Bedroom Mound—450 GPD— 10691-P(N.01/01, R 10/12) <br /> Replacement- 18"to limiting factor— Pressure Distribution Component Manual—Ver. <br /> Effluent Filter-Maintenance required 2.0,SBD-10706-P(N.01/01, R. 10/12) <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative <br /> Codes and Wisconsin Statutes.The submittal has been CONDITIONALLY APPROVED.This system is to be <br /> constructed and located in accordance with the enclosed approved plans and with any component manual(s) <br /> referenced above.The owner,as defined in chapter 101.01(10),Wisconsin Statutes,is responsible for compliance <br /> with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the Department per <br /> s.145.06,stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> Reminders <br /> • Care must be taken to set the dose volume as approved in the plan design.If the minimum tether length of <br /> a single switch mechanical float does not allow the proper dose volume,two separate floats must be used. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches. <br /> Smearing and compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil <br /> moisture content can be determined by rolling a soil sample between the hands.If it rolls into a 1/4-inch <br /> wire,the site is too wet to prepare.If it crumbles,site preparation can proceed.If the site is too wet to <br /> prepare,do not proceed until it dries. <br /> • The mound site shall be properly prepared prior to plowing.Any grasses longer than 6"shall be cut short <br /> and removed.To avoid matting,any leaves or loose organic matter shall be raked up and removed.Cut <br /> trees and shrubs flush to the ground and leave stumps.Avoid operating equipment on the mound site.If <br />