Laserfiche WebLink
Surveyor checks these after GIS review <br /> Vlvlath check each lot and add all parts to be sure totals are correct. <br /> 1/boes the proposed CSM fit with the parcel map, if available? <br /> 1/are all structures,bodies of water,wetlands,slopes over 20%,floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> /f'Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> Y Reconciles with Real Property Listing-Comments <br /> X Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> No Has there been an adjacent CSM recorded with 4 parcels of 1 %2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> hlo Is the parcel in MFL? <br /> Ne, Does CSM change or cross school or other taxing districts? <br /> X Parcel Identification Number(s): ast55 <br /> X Lot Number with improvements Comments Lot 'Z <br /> Treasurer Review-(Let Surveyor know about delinquency) ,,t <br /> Treasurer Check for Taxes owed L_:QX• ;tr,_ei 2t <br /> 273 ciy_ ceyb- <br /> SIGNATURE OF REVIEWER: / DATE: /V2-"Ria-e9 Z <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />