Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> Does the proposed CSM fit with the parcel map, if available? <br /> / <br /> Are all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> j. on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Does the CSM cross a section line, 40 line or Gov't Lot line? If so,make sure the corresponding data is shown. <br /> 4 <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> x Reconciles with Real Property Listing—Comments <br /> N, Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> Njo Has there been an adjacent CSM recorded with 4 parcels of 1 'h acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> No Is the parcel in MFL? <br /> No Does CSM change or cross school or other taxing districts? <br /> X Parcel Identification Number(s): 0.658 <br /> X Lot Number with improvements—Comments go.vh lots halve Impiro r .n-s <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> ✓Treasurer Check for Taxes owed L LC_. <br /> ci 3 /atoS8) ±a . vLu_ 4-=?Dc)--I l6.uo/. VI q..20.1.. ._ 9Z-- <br /> SIGNATURE OF REVIEWER: / _ DATE: 09/7°1"7 <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />