Laserfiche WebLink
Attachment A — Conditional Use Request <br /> Luther Point Bible Camp <br /> 1. Construct a building that will be used as a — <br /> ❑ Storm shelter/meeting area/covered recreation area <br /> ❑ Infirmary to replace the existing infirmary <br /> ❑ Summer staff housing to replace the existing summer staff housing <br /> ❑ Summer staff office to replace the existing summer staff office <br /> ❑ Winter sleeping space <br /> 2. Modify two existing buildings into shower houses <br /> ❑ The existing buildings/uses (infirmary and summer staff housing) in the existing two <br /> buildings will be moved to the new building defined above <br /> ❑ The two buildings will remain accessory buildings and the footprints will remain the same <br /> 3. Extend the length of time for Conditional Use validity <br /> ❑ We request that the time frame for the Conditional Use Permit be extended from the one <br /> year for beginning of construction to five years <br /> Conditional Use Application Luther Point Bible Camp <br /> Attachment A Page'1 of 1 <br />