Laserfiche WebLink
��e�srare, � e, DIVISION OF INDUSTRY SERVICES <br /> � N'\ t� a 2331 SAN LUIS PL <br /> c.5 I �. ,. GREEN BAY WI 54304-5211 <br /> S 541 i ''r Contact Through Relay <br /> P v!� r . ' t3 http://dsps.wi.gov/programs/industry-services <br /> l s �yi�'J <br /> \�\ / www.wisconsin.gov <br /> \/%1,0,- <br /> Tony <br /> �IS�io ?1�' Tony Evers-Governor <br /> Dawn Crim-Secretary <br /> May 14,2019 <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES:2021-05-14 I <br /> Plan Review:PWTS-051900004-MR <br /> WADE A RUFSHOLM <br /> PO Box 514 24702 Lind Road <br /> Siren WI 54872 <br /> SITE: Greg Younker <br /> i4 Stillson Road <br /> Town of Trade Lake <br /> Burnett County <br /> Total Amount: $250.00 <br /> Pressure Distribution Component Manual <br /> Ver.2.0,SBD-10706-P(N.01/01,R 10/12) <br /> Mound Component Manual <br /> Description: 300 GPD(2 Bedrooms—Replacement) <br /> Maintenance Required <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes <br /> and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. This system is to be <br /> constructed and located in accordance with the enclosed approved plans and with any component manual(s) <br /> referenced above.The owner,as defined in chapter 101.01(10),Wisconsin Statutes,is responsible for compliance <br /> with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the Department per s.145.06, <br /> stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • Preserve dispersal area prior and during construction to avoid disturbance,compaction and use of the site. <br /> • Any tall grasses,leaves and shrubs shall be cut short and removed prior to tilling the surface for installation to <br /> prevent matting under the dispersal area. All loose organic material to be removed from mound area. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches. <br /> Smearing and compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil <br /> moisture content can be determined by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire, <br /> the site is too wet to prepare.If it crumbles,site preparation can proceed.If the site is too wet to prepare,do not <br /> proceed until it dries. <br /> • Abandon Existing System per SPS 383.33 <br /> • Pump Floats to be set and verified per approved plan. Any changes may result in pump resizing to mv of <br /> TDH and GPM Specifications. <br /> Al6 <br /> 2 r6 -44-/4"-- <br /> 2gj <br />