Laserfiche WebLink
' Surveyor checks these after GIS review <br /> 1/Math check each lot and add all parts to be sure totals are correct. <br /> !Iu he proposed CSM fit with the parcel map,if available? <br /> Are all structures,bodies of water,wetlands,slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> ii) /hoes the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> x Reconciles with Real Property Listing-Comments <br /> No Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> - Are additional parcels being created? <br /> ' Are owner's certificates from all parties of interest included? <br /> - Has the CSM been approved by all approving authorities like a plat? <br /> - Is it monumented the same as a plat with bigger monuments at corners? <br /> Ne Has there been an adjacent CSM recorded with 4 parcels of 1 'A acres each or less within a period of 5 years? <br /> 236.02(12) <br /> No Is the parcel in MFL? <br /> ,N o Does CSM change or cross school or other taxing districts? <br /> )C Parcel Identification Number(s): (LS& (0988 <br /> Lot Number with improvements-Comments <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> %/Treasurer Check for Taxes owed frC 4QA.2 Qau.d.4.AK. .44,..,.."_, .6e--___ <br /> -1 0,a- 19 929 1p98g , 9,Z1 8/5/ <br /> SIGNATURE OF REVIEWER: �f� DATE: 97 2-2-- <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />