Laserfiche WebLink
Surveyor checks these after GIS review <br /> 1/Mat check each lot and add all parts to be sure totals are correct. <br /> Does the proposed CSM fit with the parcel map, if available? <br /> VAre all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> ,/Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> s Reconciles with Real Property Listing—Comments <br /> No Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> - Are additional parcels being created? <br /> - Are owner's certificates from all parties of interest included? <br /> - Has the CSM been approved by all approving authorities like a plat? <br /> - Is it monumented the same as a plat with bigger monuments at corners? <br /> No Has there been an adjacent CSM recorded with 4 parcels of 1 1/2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> >J a Is the parcel in MFL? <br /> n(p Does CSM change or cross school or other taxing districts? <br /> x Parcel Identification Number(s): $$rjq 88(c0 <br /> x Lot Number with improvements—Comments tone. <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes owed fl Crit _ fp.. <br /> C Z4.— yes-9 y- eez o. ! q/9/a� <br /> SIGNATURE OF REVIEWER: j__ - DATE: ( / ?Z Z <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />