Laserfiche WebLink
Surveyor checks these after GIS review <br /> t--4ath check each lot and add all parts to be sure totals are correct. <br /> Voes the proposed CSM fit with the parcel map, if available? <br /> //Are all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> ADoes the CSM cross a section line, 40 line or Gov't Lot line?If so, make sure the corresponding data is shown. <br /> 7 RPL Review-Surveyor/Zoning looks into any issues <br /> x Reconciles with Real Property Listing-Comments <br /> No Does this CSM cross the exterior boundary of a recorded plat?236.34 (1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> No Has there been an adjacent CSM recorded with 4 parcels of 1 1/2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> 00 Is the parcel in MFL? <br /> tJo Does CSM change or cross school or other taxing districts? <br /> X Parcel Identification Number(s): Q458 ,2458@2 Q4581 <br /> x Lot Number with improvements-Comments Lot <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> /Treasurer Check for Taxes owed 213,4.. 171.58-8 -2111-5-8.)._ V- qSr?/ 0_4_4 <br /> Lia --/--r-de . - 9/iS1c) <br /> SIGNATURE OF REVIEWER: DATE: !/ I 9 t 24 ZZ- <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />