Laserfiche WebLink
Local Health Authority: <br /> Burned Co.Zoning (715349-2139 Component Manufacturer(bnk): <br /> ug'as CO.Zoning (715)395-1380 Skew Precast (800)924-862 <br /> PO9t Co.Zonktg ('715 9279 Weiser Conoste (800}336-341 <br /> Washburn Co.Zaning (11568-2666 <br /> Lkenguad PUMW%Fiksr Malnterfan <br /> A-1 Septic Service (715)656-7007 <br /> Chapman's Septic Service (715)656-7113 <br /> Installer: Hopkins Sand&Gravel ( 15)866-4157 Stave's SePRC service (715)a66-419 i <br /> Private Onsite Wastewater Treatment System Management Ian <br /> This management plan complies with COmm1st83r 4. Wis. dm Code.and the a n Component <br /> Onsite Wastewater Systems. The specific component anu I for this P.O.W.T S.is-ate Sal Absorphot Component Manual for Private <br /> Sanitary Permit Number. Table m Design Spe0ilkeedoing <br /> Numberof Bedrooms: A Septic Tank Capacity(gal): Boo <br /> Design Flow-Peak(gpd): 3 0 o Dose Tank Capacity(gal): <br /> Estimated Flow-Average Soil Absorption Component Size(Sq. Ft. : 6 t90 <br /> g (gpd) d o o Type of Wastewater: Domestic <br /> Table 2: Soil Absorption Ill mponem-umlb of Reliable Operation <br /> Septic Tank Sal Absorption <br /> Design Flow•Peak(gpd) Component Componint <br /> Maximum Influent Particle Size(in) <br /> Maximum BOD(mg/L) n/a 1B <br /> Maximum TSS (mg/L) n/a 220 <br /> Maximum FOG nFa 150 <br /> n/a 30 <br /> Septic Tank Table 3: M Inspect and/or service verynbutancs Schedule <br /> Oudot Should inspect once a at idcleanonce every 3 years. <br /> Soil Absorption Component Inspect once every 3 ye rs. <br /> Contingency Plan:Use alternate site it available or rei nova dis ributi 3n pipe,aggregate or chambers&clogging at.. Replace distribution pipe, <br /> aggregate or chambers&C-33 fine aggregate. <br /> The seplb tank shag be maintained b an Individual termed t service Se tic Tank <br /> accordance with NR 113, Wis ( P sap nits under s.261.48. Stals. The coolants d the <br /> Trenches, Privies,a Portable gegtrooms)Servbi Septic w Holding T its, In 9 Chambers. Grease interceptors, Seepage pis,tank shat be. seopa din <br /> Page PMs. Seepage <br /> The operating condition d the sepib lank and outlet Iger sha0 ba ass <br /> to ensure Proper operation.The Iver cartridge should not be r aimvee es at est Once every 3 years by Inspection. The outlet ar shall be Ueaned as necessary <br /> removed from its <br /> enclosure. lt the leer isthe M vswos are made to retain sours In tM tank that heicale surge Ito"a an impending continuous Stuart.The s tic tank malllater ails contents removed when the volume d scum Y -mete orf the tear when <br /> the Ilguid volume d the lank. If the contents d the tank are not removed the Imo "Simmons,entsoved eche vod I the alarm is activated continuously K1 Sludge <br /> leer alarms may <br /> service needs to be Performed to maintain lose than maximum scum and sic accumulation h the tank. °9e n the lank exceeds f/J <br /> personnel shat ise the owner of when the next <br /> No one should enter a septic or other treatment or ho <br /> ld a confined$pace.The abnosphere within the n9 lone ora If reason without being in full compliance ge cs WitOSHA standards for emeries <br /> $eP�or Cher trs tme or holding look may conbin lethal geese, roaew of a person from the <br /> lntwicw of the to fit m <br /> Tank aborMonment shah be in accordance with Conan 93. be difficult or impossible. <br /> 33, W S.Adm. e wW the tank Is no longer used as a P.O.W.T.S.co <br /> eM. <br /> Notice that the dose chamhar may hill due to lbw conthu our" Do" Chambx <br /> to ad may cause the mound co P 9 pump on or power outages.One large dose when the <br /> or other measures shah be used to does the mound rAbbms. In vfth tins sltua .tin pump chamber should One <br /> power comes on or when the u <br /> such time the Pump chamber has reached its normal omppoi DOSE chamber are t be h Wm°� a licensed neer before u pump is <br /> N e pro r amount d influent.This may include manual° ration d the u p cycling begins <br /> approvals. inspected routinely and maintained when nese Pump with their <br /> Soll A 011P [On <br /> The soft absorption <br /> TainTable 2.canponenl serving this structure s designed b accept dome b waslewa <br /> are shown lm torn a fasidsntlal facility. The limits Of operation of this component <br /> The longevity of a sdl absorption component depends greatly on Proper Ih1e <br /> le operation. Good <br /> water conservation Practices by all occupants and the mslallatio d water nye g Plumbing i and system use ct rs or below the he s ef l INO of <br /> The soft absorption W n9 Plumbing fixtures are key factors h extending he useful Wa of compone <br /> Pendh obsery rs Operation a must is assessed by ospectiu at <br /> Pending. g any. in the observation pleas. and r visual he"net or an 91 Once every three years. The inspection shag inc a recording the levels or <br /> areas or erosion shoulo be indenlgbd and reported to the owner I repak. he su of Surface ge d domestic wastewater or sew e <br /> considered a human health hazard. y di disseepage or dkchaste from the mrtpen M. tin steeply sloths sites. <br /> a9 ih system is prohibited and <br /> Traub around or aver the soft absorption component should be a idetl <br /> compomuvll may lead to hydraugc failure by freezing.This P6 ulor ewktg winter months.The c <br /> gloggin. soil a wit. ibn over This component wig reduce diffusion ox s wtWadbn or removal snow cover over the <br /> ar"Wat s the soil. temporary, but a dglbug or impossible to repel un weather conditions improve. In <br /> Y9e into soft and dispersal tali. which may bad Io thea tense. and earlier.organic <br /> wastewatPlantingser <br /> ddeep-fooled Hees and shrubs directly over or within t led d <br /> wastewarer Aow Ob enl should be avoided since roof intrusion into s component may obstruct <br /> Panial plugging d the distribution network may be detected by ext eDme�lo tru n e <br /> activated to"us"Out any wild material. The liquid that is flushed 1 d the eral s to he okecled back into the distribution cog or o an acceptable container. g <br /> Y ° g time. The ends a me todistributionhdist biosis should exposed aril the pump <br /> necessary, the nerals can be cbaned. <br />