Laserfiche WebLink
Surveyor checks these after GIS review <br /> vlqath check each lot and add all parts to be sure totals are correct. <br /> Does the proposed CSM fit with the parcel map, if available? <br /> e all structures,bodies of water, wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br /> onrthe site and adjoiners shown?BC Ord. 58-52 (b) <br /> 1/ , <br /> Does the CSM cross a section line, 40 line or Gov't Lot line?If so, make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> x Reconciles with Real Property Listing—Comments <br /> No Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> - Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> - Has the CSM been approved by all approving authorities like a plat? <br /> ' Is it monumented the same as a plat with bigger monuments at corners? <br /> No Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> t.h Is the parcel in MFL? <br /> go Does CSM change or cross school or other taxing districts? <br /> r Parcel Identification Number(s): g..aos 3fo.3CA <br /> New New <br /> X Lot Number with improvements—Comments none. <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes owed cam_ ,,/ ,. ,.c._, +'-L..) <br /> 16 1- /Q %,e . 5L .. .,?8 0> 9 94- a.go S. 54 <br /> SIGNATURE OF REVIEWER: -- DATE: <br /> /D I/ZOz <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />