Laserfiche WebLink
.5861 Prairie Ridge Drive <br /> Shoreview, MN 55126-5008 <br /> Tuesday, March 20'h, 2001 <br /> Mr. Mel Ferguson <br /> M&K Septic and Excavation <br /> N6228 County Line Road <br /> Spooner, WI 54801 <br /> Dear Mel, <br /> I had a telephone conversation with Jim Flanagan about a month ago and I described what I planned to do in <br /> regards to building. He suggested I go ahead with my plans and so I have been working with Al Kempin and <br /> Laura Alton at Lamperts of Spooner and have developed plans for a new lake home. <br /> I recognize that I have only about 214 feet of lake front and that 150 feet is needed for each home. My plan is to <br /> build a new home between my existing main cottage and guest cottage but with proper set-back. After the new <br /> home is completed, both of the existing cottages would be demolished. Jim Flanagan said that seemed fine. <br /> I am enclosing two sets of plans of what we planto do. The new lake home will be 30'x36' plus an 8' deck across <br /> the front and partway along the south side. The front deck must beset back at least 78' from the ordinary high <br /> water mark to allow for steps from the deck to ground level. I will plan to be at the lake property sometime <br /> during the next couple of weeks to stake out where that should be. <br /> I want you to represent me and make the necessary application to Jim Flannagan and the zoning commission. <br /> When we have approval, I want you to locate the underground telephone lines, power fines, sewer system and <br /> gas lines. Then,I want you to excavate the area for footings for the new lake home. There will be a number <br /> of trees to take down. One is a maple which will eventually make good firewood. The remainder are pine <br /> which will have to be disposed of somehow. I will not use that for firewood. A clump of birch trees is very <br /> close to the north side of the proposed structure and may have to be removed, too. <br /> Can the sewer from the old main cottage be redirected to the new septic system until construction is complete? <br /> The existing drainfield for the old sewer is between the clothes line posts and will be right under the new house. <br /> Based on what you told me last fall,the sewer line for the new cottage can be directed to the new septic system. <br /> What have I forgotten? I will be glad to come up any time to answer any questions you might have. I will <br /> probably be moving up there and be there on a regular basis by mid-April but I think it is important that we get <br /> started on the application before then. <br /> My telephone number here in Shoreview is 651-784-3503. Let me know if and when you prefer that I come up. <br /> I understand the fee for the building permit is$200 and I am enclosing a check in that amount. Let me know if <br /> you need any other money up front. <br /> Sinc l <br />