My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/08/31 - OTHER - (NA) - Note
Burnett-County
>
Property Files
>
TOWN OF UNION
>
25498
>
2011/08/31 - OTHER - (NA) - Note
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 2:49:15 PM
Creation date
10/1/2017 6:30:46 AM
Metadata
Fields
Template:
Property Files v2
Document Date
8/31/2011
Document Type 1
OTHER
Document Type 2
(NA)
Document Type 3
Note
Tax ID
25498
Pin Number
07-036-2-40-17-36-5 15-577-055000
Legacy Pin
036910005700
Municipality
TOWN OF UNION
Owner Name
GREGG & GLENDA CROSS
Property Address
8287 CORCORAN RD
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stat�'o . Isconsiir r w ( a r a 85� :Y 4`u S <br /> rt �v't `� i : ^.t -�' �. r� ✓ s f { i6e'"ct€t,u, E tlucbmen6n RI ra <br /> �!„�Tb3 filh u v b s :+ e 54. • �' lP �£�`, i �?� r ;. ��^� <br /> DepdrtiheRCOf fatLCdl ResOUr es p,, GeneratPe MitAQPluation Packet(R1 04,. <br /> www dnr wlpage 1,6f4 <br /> This is your RIPRAP GENERAL PERMIT <br /> The Riprap General Permit(GP)Attachment is to be used in conjunction with the"Water ResourcesAaalication for Project <br /> Permits(WRAPP)"(Form 3500-53)and will not be accepted if submitted separately. Use this form when placing new <br /> riprap on the bank of a public(navigable)inland lake or flowage. Be advised the"Construction Erosion and Sediment <br /> Control"attachment is needed in addition to this General Permit Attachment if the land disturbing activity is one acre <br /> or more and the project is required to have an erosion and sediment control plan. <br /> Please fill out the form below. After you clearly demonstrate the project is eligible for the GP,this permit application <br /> is"Approved"once it is signed and dated by an authorized Wisconsin Department of Natural Resources employee. <br /> Section't: Projectl)escription <br /> Landowner(Applicant)Nameunty W teribody Name <br /> 1.ry S 5 �a ��e <br /> Total Area of Construction Site(acres) Total EstimatedDisturbedArea(acres) <br /> LL'�i5 � -V\ a,e�K_ ��7 s \V+F-v� t �a�'-•-L. <br /> Section 2 Permit Eligibility' <br /> To qualify for this GP,your project must meet certain eligibility standards. Please review and certify"Yes"the project <br /> has been designed and will be constructed in compliance with ALL of the following GP eligibility standards. If your <br /> project does not meet all of the eligibility standards,you will need to apply for an Individual Permit(IP). Beadvisedthe <br /> Department has the final discretion to determine GP eligibility and may require information in addition to the initial <br /> permit application submittal or require an Individual Permit(IP)if site-specific conditions require additional review. <br /> General Permit Eligibility Standard Yes <br /> The project site is a moderate or high energy shoreline. To determine the shoreline energy,use the <br /> Department's calculator found at: http:/Idnt.wi.gov/waterways/shoreline habitat/erosioncalculator.htmi <br /> The riprap will not be placed at an elevation higher than the ordinary high water mark plus the storm-wave <br /> height. The storm wave height is calculated and provided in the Department's shoreline energy calculator. <br /> The riprap will consist of clean fieldstone or quarry stone varying in size 6 to 24 inches in diameter. <br /> The toe of the riprap will not extend more than 8 feet waterward of the ordinary high water mark. <br /> The final riprap slope will not exceed(be steeper than)2 feet horizontal to one foot vertical. <br /> No fill material or soil will be placed in a wetland or below the ordinary high water mark of any public <br /> waterway. <br /> The riprap will follow the natural contour of the shoreline. <br /> Filter cloth or clean-washed gravel will be used as a filter layer under the riprap to extend the life of the ®' <br /> structure,improve effectiveness and prevent soil erosion behind the riprap. <br /> The riprap will be re-vegetated above the ordinary high water mark using native plantings,which may <br /> include non-woody plants,native shrub plantings,native live stakes and/or nativejointed plantings. <br /> To stop the spread of invasive species and viruses from one public waterway to another public waterway, <br /> all equipment or portions of equipment used for constructing,operating,or maintaining the project will be <br /> decontaminated for invasive species and viruses before and after use or prior to use within another public <br /> waterway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.