My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995/12/29 - SANITARY - SAN - Other
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
19194
>
1995/12/29 - SANITARY - SAN - Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 9:33:17 AM
Creation date
10/1/2017 6:59:45 AM
Metadata
Fields
Template:
Property Files v2
Document Date
6/13/2007
Document Type 1
SANITARY
Document Type 2
SAN
Document Type 3
Other
Tax ID
19194
Pin Number
07-028-2-40-14-05-5 15-575-033000
Legacy Pin
028922503300
Municipality
TOWN OF SCOTT
Owner Name
JAMES & COLLEEN WORISEK
Property Address
29273 PINE KNOLL LN
City
DANBURY
State
WI
Zip
54830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I SAF PTY&BUILDINGS DIVISION <br /> State of Wisconsin <br /> Department of Industry, Labor and Human Relations <br /> December 7, 1995 401 Pilot Court, Suite C <br /> Waukesha WI 5318 <br /> HOPKINS SAND & GRAVEL <br /> 27760 HWY 35 <br /> WEBSTER WI 54893 <br /> RE: PLAN S95-51340 FEE RECEIVED: 180.00 <br /> WORISEK, JIM <br /> 8,40,14W <br /> TOWN OF SCOTT COUNTY OF BURNETT <br /> PRESSURIZED IN-GROUND SYSTEM <br /> The Department has reviewed the above-referenced submittal. <br /> Conditional approval is hereby granted for the system plan submittal. All <br /> noted items must be corrected. The review and approval of the system is based <br /> on chapter 145, Wisconsin Statutes, and chapters ILHR 83 and 84, Wisconsin <br /> Administrative Code, and is contingent upon compliance with any stipulations <br /> shown on the plans. This system has not been reviewed for the co( e <br /> requirements set forth in chapter ILHR 82 or in chapters ILHR 50-f4, Wisconsin <br /> Administrative Code. <br /> This plan submittal approval will expire two years from the approval date, or <br /> if a sanitary permit is obtained, plan approval will expire on the day the <br /> initial sanitary permit expires. The licensed plumber responsible for this <br /> installation shall keep one set of plans with the Department's stamp of <br /> approval at the construction site. The installer shall notify the appropriate <br /> inspector when inspections can be made. <br /> All permits required by the city, village, township or county shall be <br /> obtained prior to installation. <br /> Inquiries should be directed to me at the number listed below. Please refer <br /> to the plan number shown above. <br /> Sincerely, <br /> )JJ <br /> Harold T. Stanlick, P.E. <br /> Environmental Engineer <br /> Plan Reviewer <br /> Section of Private Sewage <br /> (414) 548-8604 <br /> SNDA 7M la.1 WI <br />
The URL can be used to link to this page
Your browser does not support the video tag.