Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> �Do the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas, recorded easements and covenants <br /> the site and adjoiners shown?BC Ord. 58-52 (b) <br /> it)/Ion <br /> the CSM cross a section line, 40 line or Gov't Lot line? If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> y. Reconciles with Real Property Listing—Comments <br /> NO Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> 1`IO Has there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> 14 o Is the parcel in MFL? <br /> HO Does CSM change or cross school or other taxing districts? <br /> X Parcel Identification Number(s): 13148 13141 <br /> X Lot Number with improvements— 43 ' 4a, <br /> /Treasurer <br /> Review—(Let Surveyor know about delinquency) <br /> ✓ Treasurer Check for Taxes owed qQ,y[. 2-A.4_.. /3/'f g a-i /.3/` '7 <br /> 0(/31/c . (-?b--- 9/aD ' <br /> SIGNATURE OF REVIEWER: DATE: / ZZ_ <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />