Laserfiche WebLink
• <br /> �pprift lk[ / <br /> Wisconsin Department of Safety and Professional Services M�'' ��a, Phone:608-266-2112 <br /> Division of Industry Services e� '4 Web:http://dsps.wi.gov <br /> 4822 Madison Yards Way ' n Email:dsps a wisconsin.gov <br /> PO Box 7302 <br /> Madison,WI 53707 ':, �^ Tony Evers,Governor <br /> Dan Hereth,Secretary <br /> ssrowV. <br /> September 9,2022 <br /> CUST ID NO.: 851954 Identification Numbers <br /> ROSS JEREMY TOLLANDER Plan Review No.:PWTS-092202176-C <br /> 6881 AUSTIN LAKE RD Application No.:DIS-082243409 <br /> WEBSTER,WI 54893 Site ID No.: SIT-106426 <br /> Please refer to all identification numbers in each <br /> correspondence with the Department. <br /> CONDITIONAL APPROVAL <br /> PLAN APPROVAL EXPIRES:09/09/2024 <br /> MUNICIPALITY: CONDITIONALLY <br /> TOWN OF LINCOLN APPROVED <br /> BURNETT COUNTY DEPT OF SAFETY AND PROFESSIONAL SERVICES <br /> DIVISION OF INDUSTRY SERVICES <br /> SITE: <br /> BJORKLUND MOUND PLAN <br /> 27115 SOUTH RIVER RD I <br /> WEBSTER,WI 54893 �t -6 -Lid-it <br /> SEC.5 T39N R17W SEE CO ESPONDENCE <br /> FOR: <br /> Design Wastewater Flow Value: 600 Mound Component Manual-Version 2.1 (May 2022-2027) <br /> Bedrooms:4 <br /> Limiting Factor(s):22" <br /> Maintenance Required:Effluent Filter <br /> SITE REQUIREMENTS <br /> • A full size copy of the approved plans,specifications,and this letter shall be on-site during construction and open to inspection <br /> by authorized representatives of the Department,which may include local inspectors. A Department electronic stamp and <br /> signature shall be on the plans which are used at the job site for construction. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> • The existing system shall be properly abandoned per SPS 383.33.Ensure the mound is not placed over disturbed soil or <br /> areas where POWTS had been installed. <br /> • Prior to construction of the dispersal area,check the moisture content of the soil to a depth of 8 inches.Smearing and <br /> compacting of wet soil will result in reducing the infiltration capacity of the soil.Proper soil moisture content can be <br /> determined by rolling a soil sample between the hands.If it rolls into a 1/4-inch wire,the site is too wet to prepare.If it <br /> crumbles,site preparation can proceed.If the site is too wet to prepare,do not proceed until it dries. <br /> • The dispersal cell site shall be properly prepared prior to plowing.Any grasses longer than 6"shall be cut short and <br /> removed.To avoid matting,any leaves or loose organic matter shall be raked up and removed.Cut trees and shrubs <br /> flush to the ground and leave stumps.Avoid operating equipment on the dispersal cell site.If necessary,use only <br /> tracked equipment,during dry conditions,with minimal passes,to avoid compaction. <br /> • The building sewer shall be installed/insulated per SPS 382.30(11)(c) <br /> • Care must be taken to set the dose volume as approved in the plan design.If the minimum tether length of a single <br /> switch mechanical float does not allow the proper dose volume,two separate floats must be used. <br />