My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/02/17 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-23-31
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
18802
>
2023/02/17 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-23-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 2:08:19 PM
Creation date
2/17/2023 2:04:56 PM
Metadata
Fields
Template:
Property Files v2
Document Date
2/17/2023
Document Type 1
LAND USE
Document Type 2
LUP
Document Type 3
Accessory Structure (Non-Bunkhouse)
County Permit Number
LUP-23-31
Tax ID
18802
Pin Number
07-028-2-40-14-34-3 02-000-011000
Legacy Pin
028413404100
Municipality
TOWN OF SCOTT
Owner Name
JANE M OSBORNE
Property Address
2165 DUBOIS RD
City
WEBSTER
State
WI
Zip
54893
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
844-333-PEAK <br /> www.PeakSteelBuildings.com <br /> 706-342-9795 Office/706-343-1968 Fax <br /> P.O. Box 1275, Madison, GA 30650 <br /> Purchase Order .PEAK STEEL. <br /> Date: 01/27/2023 BUILDINGS <br /> Name: Chuck Borg Company: <br /> Address: Ship to Address: <br /> City,ST.Zip: Webster,WI. 54893 City,ST.Zip: <br /> Phone: ( 715 ) 635 - 2661 Phone:( ) - County: Burnett <br /> Fax: ( ) - Email: chuckborg66@yahoo.com <br /> BUILDING SPECIFICATIONS <br /> Width: 26' Length: 168' Eave Height: 9'6" high side Roof Pitch: 1/2:12 Bay Spacing: Mixed /See Layout <br /> Building Code: WBC-2018 Live Load: 20 Ground Snow: 60 Wnd Load: 115 Exposure: C Collateral Load: •5 <br /> Frame Type: Single Slope Column Type: Straight Left Endwall: Non-Load Bearing Right Endwall: Non-Load Bearing <br /> Roof Panel: 26 GA PBR Color: Galvalume Wall Panel: 26 GA PBR Color: TBD Trim Color: TBD <br /> NOTE: Stamped Anchor Bolt Drawings,Permit Drawings,and Erection Drawings certified for the City,County,and State listed above for which the building is shipping are included in proposed <br /> contract.This building will be manufactured to the codes and design loads stated above. It is the sole responsibility of the customer to verify these codes and design loads with your local <br /> building department. Labor,concrete,anchor bolts,and any other items not normally a part of a steel building,unless specifically provided for herein,are not a part of this contract. <br /> BUILDING ACCESSORIES <br /> TYPE QTY DESCRIPTION <br /> Insulation: Total Drip-X Roof Moisture Barrier/ Factory Applied Included <br /> Walk Door: <br /> Walk Door: <br /> Windows: <br /> Light Panel: <br /> Rollup Door 14 10'x 8' Commercial Mini Series With Tension Setter& Stainless Steel Latches Included <br /> Rollup Door: <br /> Framed Opening: 14 10'x 8'With Mullion Cover and Trim Included <br /> Framed Opening: <br /> Eave Cond: Simple Eave Base Cond: Base Channel Included <br /> Fasteners: Life-Time Fasteners With Washers/30 Year Roof and Wall Panel Warranty Included <br /> Misc: Complete Sill and Closure Package Included <br /> Misc: All Framing on Building is Galvanized/No Red Iron Included <br /> Misc: All Transverse Partition Walls Will Have Partition Trim Included <br /> SPECIAL CONDITIONS <br /> **Exact Duplicate Of Last Building/No Engineered Plans Included Per Customers Request** <br /> **Engineered Building Drawings Are Not Included** <br /> PAYMENT TERMS: FREIGHT: Included <br /> $ 11,580.00 Engineering Deposit SALES TAX: N/A <br /> $ 46,320.00 Balance Due(Cashiers Check) TOTAL: $ 57,900.00 <br /> This quote is valid for 8 DAYS <br /> This contract, subject to the terms set forth above and on the reverse This contract becomes valid only after it has been signed and accepted by an <br /> side hereof, constitutes the entire agreement between Peak Steel Officer of Peak Steel Buildings,LLC. <br /> Buildings, LLC and the Buyer. PEAK STEEL BUILDINGS REPRESENTATIVE: Brad Banks <br /> ACCEPTED BY BUYER: CONTRACT ACCEPTED AND ENTERED BY: <br /> 01/27/2023 01/27/2023 <br /> Buyer Date PEAK STEEL BUILDINGS Officer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.