Laserfiche WebLink
MOBILE-CELLULAR-COMMUNICATION TOWER cr ',1' <br /> LAND USE PERMIT APPLICATION bro`1 <br /> 7 G <br /> Burnett County, WI $, Aft) <br /> d N <br /> Permit Fees: •`' NI <br /> New Tower $3000 �\ <br /> Class 1 Collocation - $3000 <br /> Class 2 Collocation $500 <br /> *NOTE:After-the-fact(when no permit is obtained prior to construction)is up to three times the normal fee. 0 LI\ <br /> *New Tower and Class 1 Collocation—this fee includes permits for related structures on the ground. • <br /> *Class 2 Collocation—this fee does NOT include permits for structures on the ground. A separate land use F. W <br /> permit will be needed for structures on the ground. c„ CfN <br /> Burnett County regulates the placement of and/or modification to towers in accordance with Chapter 30,Burnett County . O <br /> Code of Ordinances,Chapter 66.0404 Wisconsin Stats.,and 2013 Wisconsin Act 20(which was enacted by Wisconsin on ro <br /> 7/1/2013). This permit application,once received by the Land Services Department,shall serve as the official notification to begin 0 <br /> application review,and permit issuance time constraints referenced in the above mentioned regulations. Once the application i "' <br /> is reviewed,the applicant will be notified if more information is needed,or an issued permit will be mailed to the applicant. o <br /> Class 1 Collocation means the placement of a new mobile service facility on an existing support structure,such as the <br /> owner of the facility does not need to construct a free standing support structure for the facility,but does need to engage <br /> in substantial modification. cn -0 <br /> Class 2 Collocation means the placement of a new mobile service facility on an existing support structure,such that the o ti 0 <br /> owner of the facility does not need to construct a free standing support structure for the facility or engage in substantial a <br /> modification. <br /> C7 <br /> Substantial modification means the modification of a service support structure including the mounting of an antenna F% '� <br /> on the structure that does any of the following: ,L, <br /> - For structures with an overall height of 200 ft or less,increases the overall height of the structure by more than N IQ • <br /> 20 ft o , <br /> For structures with an overall height of more than 200 ft increases the overall height of the structure by 10 a —1� <br /> percent or more <br /> - Measured at the level of the appurtenance added to the structure as a result of the modification,increases the g. <br /> width of the support structure by 20 ft or more,unless a larger area is needed for collocation rn <br /> - Increases the square-footage of an existing equipment compound to a total area of more than 2,500 square feet c <br /> C <br /> s <br /> Applicant Complete All Sections Below This Line -i (J1 <br /> Parcel Owner Name:Town of Swiss _ <br /> r <br /> c <br /> Parcel Owner Mailing Address:PO BOX 157 H i <br /> Danbury, WI.54830 — z <br /> City State Zip ~' <br /> Applicant's Name:Arthur W Chavez, Agent for Verizon Wireless -mookk <br /> Applicant's Business Name:Verizon Wireless Fee Re : >w <br /> • Ck#: <br /> Applicant's Mailing Address:220 School Street, Wood Dale, IL. 60191 5 <br /> City State Zip i <br /> Applicant's Telephone Number:708-289-2572 rz <br /> , J <br /> r <br /> Applicant's Email:achavez@buellconsulting.com rT1n 0 <br /> cn <br /> ,-3 U'W D <br /> If staff has a question about this application how do you prefer to be contacted? Check one below. 3 —< nil <br /> ❑Letter ['Phone ®Email ° ti u u u <br /> -C 00 0 <br /> m c N V Pagelof5 n t- w <br /> Burnett County, WI Tower Application—Rev 12/2021 g 2 [(1111 <br /> a <br />