Laserfiche WebLink
J <br /> Surveyor checks these after GIS review <br /> J/�Vlath check each lot and add all parts to be sure totals are correct. <br /> koes the proposed CSM fit with the parcel map,if available? <br /> e all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> AyitDoes the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> yReconciles with Real Property Listing-Comments <br /> NDoes this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> NHas there been an adjacent CSM recorded with 4 parcels of 1 '/2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> IV Is the parcel in MFL? <br /> NDoes CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s): 11914. <br /> Lot Number with improvements- LO - 1-. <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> l/ Treasurer Check for Taxes owed q kc q/c Q(23 j <br /> SIGNATURE OF REVIEWER: yom DATE: - //z 0 Z3 <br /> \production\SURVEY'\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />