My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/08/21 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-23-570
Burnett-County
>
Property Files
>
TOWN OF SCOTT
>
36527
>
2023/08/21 - LAND USE - LUP - Accessory Structure (Non-Bunkhouse) - LUP-23-570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 2:45:59 PM
Creation date
8/22/2023 2:43:07 PM
Metadata
Fields
Template:
Property Files v2
Document Date
8/21/2023
Document Type 1
LAND USE
Document Type 2
LUP
Document Type 3
Accessory Structure (Non-Bunkhouse)
County Permit Number
LUP-23-570
Tax ID
36527
Pin Number
07-028-2-40-14-05-5 05-003-011100
Municipality
TOWN OF SCOTT
Owner Name
WILLIAM J & GAIL SOBASKI
Property Address
2604 PINE KNOLL RD
City
DANBURY
State
WI
Zip
54830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/16/2023 <br /> CL ARYOBERT <br /> SOBASKI, 172802 <br /> JEFFREY MACDONALD Doc ID:5364020230416172802 <br /> BUILDING CORP. Cell Phone:(651)587-3754 <br /> ClearyBuilding.com Phone Number.(715)458-2233 <br /> Email:JMacDonald@clearybuilding.com <br /> Energy Miser 36' 0"x56' 0"x13' 4" with 12' 0" truss clearance from 100'-0" mark. (7 Bays at 8' o.c.) <br /> Details: <br /> Truss(Standard Lower Chord)with 4/12 roof pitch. <br /> Default Ceiling Design:Designed to Support a Future Steel Ceiling <br /> Type Foundation:On Concrete Slab(DrySet Brackets) <br /> Concrete Floor.Yes-Supplied by Cleary(Concrete not included unless otherwise noted in writing in the Additional <br /> Building Components section) <br /> 40 psf Roof Snow Load with 2"x4"Continuous 2'0"inch on center purlins. <br /> Exterior Finishes: <br /> Roof/Siding:PLP Prime G90 <br /> Lifetime Film Integrity Warranty,35 Year Fade and Chalk Warranty,and G-90 Galvanizing. <br /> Accessories: <br /> Standard Ridge Cap. <br /> Marco LP2 Weather-Tite Ridge Vent"Low Profile"(Add ventilation to ridge). <br /> Side Wall Overhang:24"Aluminum soffit(Sidewall)with vented soffit on S1 &S2 <br /> End Wall Overhang:24"Aluminum soffit(Endwall)with vented soffit on El &E2 <br /> (2)-Overhead frame out. Size:12'0"Width x 10'0"Height(Door not included unless shown in Additional Building <br /> Components or Clopay Building Products) <br /> (2)Walk Door-Standard,Steel Jamb 3 1/2"3'-0"x6'-8"with 2x6 frame20"x24"Insulated-Thermo Pane <br /> Interior Finish/Insulation <br /> Lean 12' 0"x24' 3 3/4"x9'4" with 8' 0" truss clearance from 100'-0" mark. (3 Bays at 8' o.c.) • <br /> Details: <br /> Connection:Building 2(Lean) is connected to Building 1,0'0"from left edge of Side Wall 2 on Building 1 <br /> Rafter with 4/12 roof pitch. <br /> Default Ceiling Design:Not Designed to Support a Ceiling <br /> Purlin Blocking:Both Endwalls are purlin blocked <br /> Type Foundation:In Ground <br /> Concrete Floor.No <br /> Open Endwall 1:Steel to the bottom of the truss,columns,girts,and treated plank are removed. <br /> Open Endwall 2:Steel to the bottom of the truss,columns,girts,and treated plank are removed. <br /> Exterior Finishes: <br /> Roof/Siding:PLP Prime G90 <br /> Lifetime Film Integrity Warranty,35 Year Fade and Chalk Warranty,and G-90 Galvanizing. <br /> Accessories: <br /> Side Wall Overhang:None on S2 <br /> End Wall Overhang:24"Aluminum soffit(Endwall)with vented soffit on El &E2 <br /> v6/11 built with pride before the C. is applied`R <br /> ,/ 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.