Laserfiche WebLink
Surveyor checks these after GIS review <br /> Vath check each lot and add all parts to be sure totals are correct. <br /> vBoe the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands,slopes over 20%, floodplain areas, recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> if//Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> Reconciles with Real Property Listing—Comments <br /> N Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> N Has there been an adjacent CSM recorded with 4 parcels of 1 1 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> 0 Is the parcel in MFL? <br /> N Does CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s): o' c3 A- 909,ct <br /> Lot Number with improvements— � 't 4- l e--z, <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> 1/ Treasurer Check for Taxes owed ti'b }.mpg ow 1Qk ilk la: V <br /> SIGNATURE OF REVIEWER: DATE: O �� �23 <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />