Laserfiche WebLink
e the exact length and bearing of the exterior boundaries,the boundary lines of all blocks,public ground, streets <br /> and eys shown?236.20 (2) (c) <br /> escribe all monuments used for determining the location of the parcel boundary and show by bearing and distance <br /> their lationship to the surveyed parcel. A-E 7.05 (4) <br /> s access to a public road shown?BC Ord. 58-81 (a)Ingress/Egress easement must be a minimum of 33' wide. <br /> f there is to be dedication of streets or other public areas,have you included the owner's certificates and mortgage's <br /> certificates? 236.34 (1) (e) <br /> Ar ere easements ? <br /> Are all of theany exactutility widths of allthat easementsneedto,be streetsshown and alleys with correct names shown? (If known on ROW.) <br /> 236.20 (2) (f). Centerlines are not required to be shown if the road is not within the CSM boundary. (per Plat <br /> Review opinion) <br /> ii.)//Water, streams, rivers and lakes. The OHWM needs to be shown and noted as"determined"or"approximate". If a <br /> creek is a boundary OHWM must be shown(per Don Sime opinion). 236.15 (1) (ag) and 236.15 (1) (d) <br /> /VAWater, streams,rivers and lakes. If an OHWM is shown as approximate, it must also include this statement,"OHWM <br /> shown is for reference only". 236.025 (3) <br /> A 1 Water, streams,rivers and lakes. Does the map include the public trust statement, "Any land below the ordinary high <br /> water mark of a lake or a navigable stream is subject to the public trust in navigable waters that is established under <br /> ��yarticle IX, section 1, of the state constitution". 236.20 (6) <br /> /V/"IAAre there any lake or stream shore meander lines according to 236.15 (1) (d)and 236.20(2) (g) <br /> �U /(Are distances shown from the meander line(20' or more)to the OHWM? 236.20(2) (g) <br /> Al 1Where there is a circular curve, are the Main chord bearing and length(and dashed or dotted line shown),radius of <br /> circle, central angle and both tangent bearings shown? Circular curve of less than 30 feet radius must be tangent to <br /> street lines and show at a minimum the radius and tangent length. 236.20 (2) (k). <br /> �e adjoiners shown and underscored with dashes or dots? Lot lines too?236.20 (3) (d)and(A-E 7.03) <br /> Are e necessary"Recorded As"bearing and lengths shown? Plat and CSM adjoiners required. 236.20 (2) (c) <br /> Have U.S. PLS Monument Record documents been filed for U.S. PLS corners?(A-E 7.08) <br /> Is there a north point properly located thereon referenced to a magnetic,true or other identifiable direction related to <br /> the ndary line of quarter section,private claim or federal reservation in which the map lies?236.20 (2) (i) <br /> Is there a tie by bearing and distance to a boundary line of 1/4 section,recorded private claim or federal reservation in <br /> Olt <br /> the map lies. 236.20 (3) (b) <br /> Os the section breakdown shown or referenced from another map?Found or Theoretical Center used?Found or <br /> ���)h retical 40 or GL corners used?(A-E 7.05) <br /> Is each sheet signed, sealed and dated?(A-E 7.05) <br /> Isit e information on the map placed to allow for ease of reading the information? <br /> Strict compliance with requirements of this section (Surveying Requirements—Monuments) may be waived by the <br /> Plat Review for CSM's. Monuments within a street can be set at right-of-way in lieu of actual corner. 236.15 (1)(a) <br /> and 236.15 (1) (g) <br /> /V//fDoes Trans 233 apply? Only applicable for state highways and only on Plats. <br /> Any spelling errors or typos? <br /> Addressing Review <br /> Are there any proposed private or public roads shown? If so, does the name conflict with any others in the county? <br /> n If a private road is proposed make sure"Road"isn't used in the name. Use Lane, Drive, Path,Trail,Way, Circle, etc. <br /> ,to signify a private road. <br /> fit <br /> If a private road is proposed, has the private road sign fee been paid? <br />