Laserfiche WebLink
Surveyor checks these after GIS review <br /> ` M th check each lot and add all parts to be sure totals are correct. <br /> t Do the proposed CSM fit with the parcel map, if available? <br /> I-----Are all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> n the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Does the CSM cross a section line, 40 line or Gov't Lot line? If so,make sure the corresponding data is shown. <br /> g <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> yReconciles with Real Property Listing-Comments <br /> iv Does this CSM cross the exterior boundary of a recorded plat?236.34 (1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> IV Has there been an adjacent CSM recorded with 4 parcels of 1 1/2 acres each or less within a period of 5 years? <br /> , r 236.02 (12) <br /> IV Is the parcel in MFL? <br /> NDoes CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s):d\ j 0 So <br /> Lot Number with improvements- Lo 3 <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> 1V Treasurer Check for Taxes owed ,�� . yes ak_i_o 8(aot(--,)3 (- ) <br /> SIGNATURE OF REVIEWER: DATE: / / zoZ3 <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />