Laserfiche WebLink
Surveyor checks these after GIS review <br /> ath check each lot and add all parts to be sure totals are correct. <br /> oes t proposed CSM fit with the parcel map, if available? <br /> e all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> onw the site and adjoiners shown?BC Ord. 58-52 (b) <br /> 1/1.--Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> yReconciles with Real Property Listing—Comments <br /> NDoes this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> IV Has there been an adjacent CSM recorded with 4 parcels of 1 Y2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> I V Is the parcel in MFL? <br /> Iv Does CSM change or cross school or other taxing districts? <br /> Parcel Identification Number(s): 3a 50 ci d- 3 a O 5 <br /> X Lot Number with improvements— (,.by-- I d- Lpf 2 <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> 1 'Treasurer Check for Taxes owed t.cij 'TigX FS CI(QQA <br /> ') <br /> SIGNATURE OF REVIEWER: DATE: A9 _ Z <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />