At-grade System Sloping Site Cross Section and Plan View
<br /> t1 rE i.
<br /> I ' Dimension Feet 1
<br /> I '•L:L:::▪ tL:L•:L:•:r :L:::j•:::Lj::L •L::•t•:t•.:L.:rL:L•:rL:rL•:rL.:::.rr.rr•rtit.:jL•:•:rL:tir.:LLL.: I I
<br /> A
<br /> 1 ▪ L•L•L•L•L•L•L•Lpy:: :::„.. *:::::L•L•L•L•L•L•L•L• •L•L•L•L'L•L•L•L•L•L•L• •L•L•L• 1 A
<br /> .r;j;t,j,j,j,t,r,f,j,j,•,j,j,r,r,r,f,j,j,f,j,j,j,j,f,j,r,j,j,r,r,r,f.,..j.;.f.f.j.f.j.j � '.�
<br /> L•••••.•L•L•L•'.•L•L•L•'••L•L•L•L•L•Llve• •L•L•L•L•L::::::L•L•L•L•L•'ti'L•L•L•L•L• •L•L•L• 1
<br /> 'r•j•r't•r•t•r•r•r•r•r•r•r•r•t•r•r•.'•r•.•r•j•r•r•r•r•r•r•r•r•j•r•r•r•r•r•r•r•r•r•r•r•r B
<br /> 11 I . L••.•L•L•L•L•L•L•L•L••.•L•L•L•L•L•L••••L.L•L•L•L•L•LVIAT:•L•L.L•L•L•L•L•L•L•L•L•L•L•L•
<br /> f.;.;.f.;.;.j.j.,•.j.j.j.;•;.f.j.:.j.j.;.f.;.f.j.j,r•t•j•t•t•j•t•r•r•r•r•r•:•r•r•r•r•: �.-
<br /> . :;L•L•L•L•`.•L•L•L•L•L•L•L•L•L•L•L•L•L•L•L•L••.•L•L•L*::•L•L•L•L•L•L•L•L•:•L•L•L•L•:• I
<br /> I r• •:; :ti ti�{ P.74.7.ti�ti�{:tirti.7.114t..741 tiftir{t{j{{{r%.�{{{:tij.:41*:PY*1:14:;:: 1/6 B /✓
<br /> 1 'r.��r:•:•:'-.•r•r•r•r•r•r•:•r•r•r•r•r•r•r•r•r•r•r•r•r•j•j•j•j•j•j•f•j•r'r'r•r•f•f•j•f I r
<br /> A , L•L•L•L••.,L•:•:•L••.,L•:•:•:•L•:•:•L•L L•L•L•L•L•L••.•L•L•L••.•L•L•L•L•:•L•L•L•L•L••.•
<br /> W 1 't•t•r•r•r•:•.•t•r•r•r•.•r•t•:•:•t•r•:•r•r•r•r•r•r•t•r•r•r•r•r•r•r•r•r•:•t•r•r•r•r•r•: C
<br /> . L••.•L•L•L•L•L••.•L•L•L•'.•L•L•L•L•L•L•L•L•'.•L•L•L•L•L•L;'.••.•L•L•:••.•L•L•L•L•L•L•L•L•L• 1 '/.
<br /> j.;.;.;.;.;.;.;.;.;.;.;.;.r•r•:.r•:•r•:•r.:•r•:•:•r•r•. r.:.r.r•r•r•r•:•r•r•r•r•:•r•r 1. L•'.•'.•L•:••.•L•L• •L••.•L•L••••:•L•L•L•L•L•L•L•L•L•L•L•L••y•L•L•L•L•L•L•L.L.L•L•L.•.••..L• D 2.0
<br /> Ir•:•:•r•:•r•:•r•r :•r•:•r•r•r•r•r•r•:•r•:•r•:•r•r•r•r•:•:•r•:•r•:'f•:•r•;•r•r.r•:•:..'
<br /> 1 r r•;•r :•:j•.j.)rj ::.r; r;L t•L••L•LL: f ; r•L.:L•:•• • rLL•; •rr•r ;ti•r 5 ;
<br /> . L L L LL L ' L LL 1•L .0.10.L .•. . L t•1•L •LL: : • • •••tiLL• •ti%%0•5•
<br /> 1
<br /> E 5.0
<br /> 1 L:•Lr•:::::: : rLLc: LLAl.v•r :r: rL: : f••LL .L1:s.7.LLr•.r•: rove_ Lr•. r•L: 1
<br /> • 'L::..:J tL•'ffLf,rLjfjL •fjr 1:.1•j• Ljffjfjffr•LS.:5: Lf•rrt.jrj 1 F 0.5
<br /> 1 .fLfLj LjLjLjLLLjLf.jLjLfLjLjLffjLLfjLfLfLfLjLfLfjL .rLjLtLLLtLrL:
<br /> 1 '.we *n!..1L•:A j� Ly*.: :L.: :• •.1.nrLL ••LLLLtis}:}:}a3"�• 1 G 1.0
<br /> 1
<br /> L �'C7'
<br /> E f 1/6 B
<br /> • ♦ E4 B � +
<br /> L • % Slope
<br /> I - 1 =Plowed 7.-.7 =Clean aggregate =4 in. sch. 40 pvc
<br /> I. _ ; basal area ti '/z to 2 '/z in. dia. observation pipe
<br /> Lateral with 2" Topsoil Cap •.
<br /> aggregate over pipe
<br /> Observation Pipe
<br /> Geotextile G 4With Cap
<br /> Fabric
<br /> . r•f•j•j.j 40 �f-6 . i Ft Lateral Invert
<br /> r r r r j.j.j. 'j:j.j:f:•:j:j:j:•.
<br /> fLti :•T::ig•L•L•L•. L•L•L• •::L•:•L•L:L•L 11 Topsoil Cap
<br /> •�.r•�.r,f.j•r•j•r �•r.r.:, r•r : r.
<br /> . 5.: : L L L•L•L ti• L•L•L ti L ti
<br /> r•r•;•r•r•r•r;r•r• F r';•r•f: '� ._.f.f.r.d.
<br /> '111.10 ��iti.tifti ::::p L Lti L• L.. _•_.
<br /> t•r-iiiv;7•r•�-. r r•r, / f•j•
<br /> �•• ti;ti ;};••;f; Y Ft Contour ;•L•L•L•L•L•L•L••
<br /> ,, 1111"1117►7.�_ . . �::r�ftirtir:'ti:'tiftifti.:.
<br /> 1►� PIIMINtiVtiN 11�>>i: '-•:r:f:j_r�r:�:�:r.f.f.r.r f.r.f.j.r.;.r.
<br /> Ott ig140 � 4� 11 PWIN 44 7Y:Y r: -' L•i L•L• ::: •-
<br /> �� j•,r;:•r•r•r•f•r:
<br /> T� D Plowed Surface 1111 - - •
<br /> -
<br /> C 1111111v14
<br /> Slope Direction -----
<br /> GENERAL INSTALLATION: The at-grade area is staked out along the design contour. Existing
<br /> vegetation is mowed and raked off the site. The basal area (L x W) is staked out and plowed with a
<br /> moldboard or chisel plow. Plowing may not proceed if the soil is wet enough at the plow depth to
<br /> form a 1/4 inch soil wire when a sample is rolled between the palms of the hands. The A x B area is
<br /> covered by clean aggregate deposited overhead by a backhoe. Special care must be used when
<br /> placing the aggregate to minimize compaction of the plowed surface. After the topsoil cap is placed,
<br /> the entire at-grade is seeded and mulched to promote vegetative growth, limit erosion and protect
<br /> from freezing. The observation pipes are perforated in the lower 6 inches and secured in place.
<br /> (-)
<br /> 03/051gi Page .~, of/
<br />
|