Laserfiche WebLink
/' Surveyor checks these after GIS review <br /> l/ M check each lot and add all parts to be sure totals are correct. <br /> Does the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> 1/wDoes the CSM cross a section line, 40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> ''`/ Reconciles with Real Property Listing—Comments <br /> N Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> 1 l Has there been an adjacent CSM recorded with 4 parcels of 1 1/2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> nj Is the parcel in MFL? <br /> 1.1 Does CSM change or cross school or other taxing districts? <br /> _A_Parcel Identification Number(s): aop (2 ,- 3465.c) <br /> x Lot Number with improvements— 1.VA <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes owed 'j 7Ag., m �(t.pf p'1ce <br /> SIGNATURE OF REVIEWER: DATE: Z_X <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />