Laserfiche WebLink
Surveyor checks these after GIS review <br /> VMMath check each lot and add all parts to be sure totals are correct. <br /> V D s the proposed CSM fit with the parcel map, if available? <br /> L Are all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on he site and adjoiners shown?BC Ord. 58-52 (b) <br /> iz <br /> Does the CSM cross a section line, 40 line or Gov't Lot line?If so, make sure the corresponding data is shown. <br /> RPL Review-Surveyor/Zoning looks into any issues <br /> 1 Reconciles with Real Property Listing-Comments <br /> .y Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> N Has there been an adjacent CSM recorded with 4 parcels of 1 1/2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> t\I Is the parcel in MFL? <br /> (J Does CSM change or cross school or other taxing districts? <br /> x Parcel Identification Number(s): gcolidi ,5t 2�i Z�,'czt <br /> x Lot Number with improvements- Lot a, l A'k it k- 1 , <br /> Treasurer Review-(Let Surveyor know about delinquency) <br /> y Treasurer Check for Taxes owed ----- ( ota_ 9 12 { S cs otsk‹._ --4.-4n., <br /> SIGNATURE OF REVIEWER: DATE: 3//g.� --1-(' <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />