Laserfiche WebLink
INSTRUCTIONS <br /> 1. A sanitary permit is valid for two (2) years. <br /> Your sanitary permit may be renewed before the exp a^on date and at the time of renewal any new <br /> criteria in the Wisconsin Adrnimstranve Code wil' he apphcably. <br /> 5. All revisions to this perm,t must he approved by the permit issuing authority. <br /> 4. Changes in ownership or plumber requires a Sannary permit T-ansfe,'Renewal "orm (SBD 53991 to be <br /> submitted to the county prior to nstallatior. <br /> 5 Onsite sewage systems must be properly maintained The septa 'a-k!s; m,st be pumped by a 'i ens-ed <br /> pumper whenever necessary, usually every 2 to 3 years <br /> 6 If ;mu have questions concerning your onsite sewage system; contact your Iota! code administrator or the <br /> State of Wisconsin, Safety 8 Buildings Division, 608-266-3815. <br /> To be complete and accurate this sanitary permit application must include <br /> I. Property owner's name and mailing address. Provide the legal description and parcel tax number(s) of <br /> where the system is to be installed. <br /> II. Type of building being served. Check only one and complete # of bedrooms if 1 or 2 Family Dwelling. <br /> III. Building use. If building type is Public, check all appropriate boxes that apply_ <br /> IV. Type of permit. Check only one in line A. Complete line B if permit is for tank replacement, reconnection, or <br /> repair. <br /> V. Type of system. Check appropriate box depending on system type. <br /> VI. Absorption system information. Provide all information requested in #1-7. <br /> VII. Tank information. Fill in the capacity of every new and/or existing tank. list the total gallons, number of <br /> tanks and manufacturer's name. Indicate prefab or site constructed and tank material. Complete for a// <br /> septic, pump/siphon and holding tanks for this system. Check experimental approval only if tanks received <br /> experimental product approval from DILHR. <br /> VIII. Responsibility statement. Installing plumber is to fill in name, license number with appropriate prefix (e.g. <br /> MP, etc.), address and phone number. Plumber must sign application form. <br /> IX. County/Department Use Only. - <br /> X. County/Department Use Only. <br /> Complete plans and specifications not smaller than 8'h x 11 inches must be submitted to the county, The <br /> plans must include the following. A) plot pian, drawn to scale or with complete dimensions, location of <br /> holding tank(s), septic tank(s) or other treatment tanks, building sewers:, wells, water mains/water service: <br /> streams and lakes; pump or siphon tanks: distribution boxes; soil absorption systems; replacement system <br /> areas:. and the location of the building served; B) horizontal and vertical elevation reference points; <br /> C) complete specifications for pumps and controls; dose volume; elevation differences; friction loss; pump <br /> performance curve; pump model and pump manufacturer; D) cross section of the soil absorption system if <br /> required by the county, E) soil test data on a 115 form; and F) all sizing information. <br /> --------------------- <br /> GROUNDWATER SURCHARGE <br /> 1983 Wisconsin Act 410 included the creation of surcharges (fees) for a number of <br /> regulated practices which can effect groundwater. <br /> The monies collected through these surcharges are used for monitoring groundwater, ground- <br /> water contamination investigations and establishment of standards. <br /> SBD-6398(R.11/88) <br />