Laserfiche WebLink
Surveyor checks these after GIS review <br /> Math check each lot and add all parts to be sure totals are correct. <br /> I/Does the proposed CSM fit with the parcel map,if available? <br /> Are all structures,bodies of water,wetlands,slopes over 20%,floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> Oboes the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> �{ Reconciles with Real Property Listing—Comments <br /> Ni Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> 4 Has there been an adjacent CSM recorded with 4 parcels of 1 I/2 acres each or less within a period of 5 years? <br /> 236.02(12) <br /> tJ Is the parcel in MFL? <br /> t Does CSM change or cross school or other taxing districts? <br /> )0 Parcel Identification Number(s): 310 $3 Oct, $ O g <br /> 0 Lot Number with improvements— <br /> Treasurer Review—(Let Surveyor know about <br /> delinquency) <br /> Treasurer Check for Taxes owed —1--,es ,d n �-r / �Qwir <br /> SIGNATURE OF REVIEWER: DATE: 37,070 at <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />