Laserfiche WebLink
Surveyor checks these after GIS review <br /> L M check each lot and add all parts to be sure totals are correct. <br /> zI/ Do the proposed CSM fit with the parcel map, if available? <br /> Are all structures,bodies of water,wetlands,slopes over 20%, floodplain areas, recorded easements and covenants <br /> n the site and adjoiners shown?BC Ord. 58-52(b) <br /> 4i <br /> Does the CSM cross a section line,40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> YReconciles with Real Property Listing—Comments <br /> IJ Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> q Has there been an adjacent CSM recorded with 4 parcels of 1 %2 acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> N Is the parcel I MFL? <br /> pj Does CSM change or cross school or other taxing districts? <br /> yi Parcel Identification Number(s): 3Lt°195 a- dGlG►b <br /> ,o Lot Number with improvements— Lth 32 d- Lc* 3Fl <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes owed �juc c,S t9A.1G€ u n crikft — oil <br /> SIGNATURE OF REVIEWER: DATE: g 27 2'&2V <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />