Laserfiche WebLink
Surveyor checks these after GIS review <br /> ath check each lot and add all parts to be sure totals are correct. <br /> �es the proposed CSM fit with the parcel map, if available? <br /> all structures,bodies of water, wetlands, slopes over 20%, floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52 (b) <br /> A;tDoes the CSM cross a section line, 40 line or Gov't Lot line? If so, make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> Reconciles with Real Property Listing—Comments <br /> Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at corners? <br /> &Has there been an adjacent CSM recorded with 4 parcels of 1 '/z acres each or less within a period of 5 years? <br /> N� // 236.02 (12) <br /> r Is the parcel in MFL? <br /> /Does CSM change or cross school or other taxing districts? <br /> _1,�Jarcel Identification Number(s): a>c /'d S , 7t <br /> ),—�—Lot Number with improvements— k©l1 �- <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> Treasurer Check for Taxes owed X?1 AL ilK -64 11 /lZII/Ztf �,-7 <br /> SIGNATURE OF REVIEWER: DATE: �� Z <br /> \production\SURVEY\MISC ITEMS\Review Docs\CSM checksheet May_2018 <br />