Laserfiche WebLink
ORDER AND DETERMINATION <br /> THE REQUESTED VARIANCE IS GRANTED, HOWEVER, THE APPROVAL IS SUBJECT <br /> TO THE FOLLOWING CONDITIONS/EXCEPTIONS: <br /> With the following condition(s): <br /> 1- Shoreline to follow state standard viewing and access corridor width, which is not to exceed 30% of the <br /> shoreline for the corridor width, and the vegetated natural area needs to be to a depth of 37.5 feet <br /> landward from the Ordinary High Water Mark (OHWM). This is the same requirement as listed in state <br /> statute 59.692(1v)(d) which allows for up to 200 sq ft of open sided construction within the 75 ft setback. <br /> (They have approximately 265 ft of shoreline which would allow an 80 ft wide viewing and access <br /> corridor) <br /> 2- Land Use permit to be obtained by 5/1/2025. <br /> 3- Follow all local, county, state and federal requirements for this activity. <br /> THE ZONING ADMINISTRATOR IS DIRECTED TO ISSUE A LAND USE PERMIT INCORPORATING THESE <br /> CONDITIONS. <br /> ANY PRIVILEGE GRANTED BY THIS DECISION MUST BE EXERCISED WITHIN ONE YEAR OF THE DATE OF <br /> THIS DECISION BY OBTAINING THE NECESSARY BUILDING, LAND USE AND OTHER PERMITS FOR THE <br /> PROPOSED CONSTRUCTION. THIS PERIOD WILL BE EXTENDED IF THIS DECISION IS STAYED BY THE <br /> ORDER OF ANY COURT OF OPERATION OF LAW. <br /> THIS DECISION MAY BE APPEALED BY FILING AN ACTION IN CERTIORARI IN THE CIRCUIT COURT FOR THIS <br /> COUNTY WITHIN 30 DAYS AFTER THE DATE OF FILING OF THE DECISION. THE MUNICIPALITY ASSUMES NO <br /> LIABILITY FOR AND MAKES NO WARRANTY AS TO RELIANCE ON THIS DECISION IF CONSTRUCTION IS <br /> COMMENCED PRIOR TO EXPIRATION OF THIS 30-DAY PERIOD. <br /> BOARD OF ADJUSTMENT/APPEALS <br /> n <br /> SIGNED , CHAIRPERSON <br /> ATTEST <br /> C SECRETARY <br /> DATED L2� FILED <br /> CC: PARTIES OF INTEREST <br />