Laserfiche WebLink
. Surveyor checks these after GIS review <br /> ath check each lot and add all parts to be sure totals are correct. <br /> V1150es the proposed CSM fit with the parcel map,if available? <br /> k Are all structures,bodies of water,wetlands,slopes over 20%,floodplain areas,recorded easements and covenants <br /> on the site and adjoiners shown?BC Ord. 58-52(b) <br /> Does the CSM cross a section line,40 line or Gov't Lot line?If so,make sure the corresponding data is shown. <br /> RPL Review—Surveyor/Zoning looks into any issues <br /> — Reconciles with Real Property Listing—Comments <br /> 14 Does this CSM cross the exterior boundary of a recorded plat?236.34(1) <br /> Are additional parcels being created? <br /> Are owner's certificates from all parties of interest included? <br /> Has the CSM been approved by all approving authorities like a plat? <br /> Is it monumented the same as a plat with bigger monuments at comers? <br /> �I Has there been an adjacent CSM recorded with 4 parcels of 1 %z acres each or less within a period of 5 years? <br /> 236.02 (12) <br /> N Is the parcel in MFL? <br /> N Does CSM change or cross school or other taxing districts? <br /> _C< Parcel Identification Number(s): 11144 <br /> _A_-Lot Number with improvements— L4 <br /> Treasurer Review—(Let Surveyor know about delinquency) <br /> X Treasurer Check for Taxes owed No "i aqig,ik `t'� <br /> SIGNATURE OF REVIEWER: DATE: /Z I/ z <br /> \production\SURVEY\MISC rrEMS\Review Docs\CSM checksheet May_M18 <br />