Laserfiche WebLink
• Components and soil removed from an existing drain field shall be properly disposed of so that there is no <br /> risk to public or environmental health. <br /> • A sanitary permit must be obtained from the county where this project is located in accordance with the <br /> requirements of Sec. 145.19,Wis.Stats. <br /> • Inspection of the private sewage system installation is required.Arrangements for inspection shall be made <br /> with the designated county official in accordance with the provisions of Sec. 145.20(2)(d),Wis. <br /> Stats. <br /> • A state approved effluent filter is required. Maintenance information must be given to the owner of the tank <br /> explaining that periodic cleaning of the filter is required. <br /> • A copy of the approved plans, specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors. <br /> Owner Responsibilities <br /> • The current owner, and each subsequent owner, shall receive a copy of this letter. Owners shall also receive a <br /> copy of the appropriate operation and maintenance manual(s) and be responsible for ensuring that POWTS is <br /> operated and maintained in accordance with this chapter and the approved management plan under s. SIPS <br /> 383.54(1). <br /> • In the event this soil absorption system or any of its component parts malfunctions so as to create a health <br /> hazard,the property owner must follow the contingency plan as described in the approved plans. <br /> • The owner is responsible for submitting a maintenance verification report acceptable to the county for <br /> maintenance tracking purposes. Reports shall be submitted at intervals appropriate for the component(s) <br /> utilized in the POWTS. <br /> In granting this approval the Division of Industry Services reserves the right to require changes or additions should <br /> conditions arise making them necessary for code compliance.As per state stats 101.12(2), nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building, structure, or component. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the <br /> address on this letterhead. <br /> The above left addressee shall provide a copy of this letter and the POWTS management plan to the owner and <br /> any others who are responsible for the installation, operation or maintenance of the POWTS. <br /> Sincerely, <br /> f / oivZey <br /> Joshua Rowley <br /> POWTS Plan Reviewer, Division of Industry Services <br /> (715) 634-5124 <br /> Joshua.rowlev@wisconsin.gov <br />