Laserfiche WebLink
a�enRrnrr•Nr <br /> Wisconsin Department of Safety and Professional Services y��, �c• Phone:608-266-2112 <br /> Division of Industry Services I ' Web:htto:Hdsps.wi.gov <br /> 4822 Madison Yards Way ( a` Email:dspsA*sconsin.gov <br /> PO Box 7302 a <br /> Madison,WI53707 Tony Evers, Governor <br /> Dan Hereth,Secretary <br /> �SfONPt^' <br /> June 29, 2023 Conditionally <br /> APPROVED <br /> CONDITIONAL APPROVAL DEPT.OF SAFETY AND PROFESSIONAL <br /> SERVICES <br /> DIVISION OF INDUSTRY SERVICES <br /> PLAN APPROVAL EXPIRES: 2025-6-29 <br /> Plan Review: PWTS-052300946-C Add" R"allef <br /> Jeffrey Fox <br /> 2188 1001h Ave SEE CORRESPONDENCE <br /> Dresser, WI <br /> SITE: <br /> Dufoere <br /> Hayden Road <br /> Burnett County <br /> Town of Oakland <br /> S5 T40 R16W <br /> FOR: <br /> Description: 11 campsites-495 GPD—103"to In-Ground Soil Absorption Component Manual 5/22- <br /> limiting factor—Effluent Filter- Maintenance 5/27 <br /> required— Pressure Distribution Component Manual —Ver. <br /> 2.1 (May 2022-2027) <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes <br /> and Wisconsin Statutes.The submittal has been CONDITIONALLY APPROVED.This system is to be constructed and <br /> located in accordance with the enclosed approved plans and with any component manual(s) referenced above.The <br /> owner, as defined in chapter 101.01(10),Wisconsin Statutes, is responsible for compliance with all code requirements. <br /> No person may engage in or work at plumbing in the state unless licensed to do so by the Department per s.145.06, <br /> stats. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> Reminders <br /> • If using the existing septic tank,it must be inspected for watertightness and structural soundness,size and <br /> baffles,and must be brought into conformance with the requirements of ch.SPS 383,Wis.Adm. Code. <br /> • A sanitary permit must be obtained from the county where this project is located in accordance with the <br /> requirements of Sec. 145.19,Wis.Stats. <br /> • Inspection of the private sewage system installation is required. Arrangements for inspection shall be made with <br /> the designated county official in accordance with the provisions of Sec. 145.20(2)(d),Wis.Stats. <br />